JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Development of Fuel Channel Inspection System in PHWR
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Development of Fuel Channel Inspection System in PHWR
Choi, Sung-Nam; Yang, Seung-Ok; Kim, Kwang-Il; Lee, Hee-Jong;
  PDF(new window)
 Abstract
A pressurized heavy water reactor (PHWR) designed to refuel in service produces the energy required by nuclear fission. The fuel channel consists of components such as a pressure tube which directly contacts the fuel and is a passage for the reactor coolant, a calandria tube which contacts the moderator and is rolled joint with calandria, and a spacer which is not to contact the pressure tube and a calandria tube. As the fuel channel is one of the most important equipments, it requires accurate and periodic inspections to assess the integrity of a reactor in accordance with CSA N285.4. A fuel channel inspection system is developed to inspect fuel channels during in-service inspection in Wolsong unit. In this paper, the results and considerations of a field test are presented in order to show the effectiveness of the developed fuel channel inspection system.
 Keywords
Pressurized Heavy Water Reactor;Fuel Channel;Pressure Tube;Calandria Tube;In-Service Inspection;
 Language
Korean
 Cited by
 References
1.
CSA Code, "Periodic inspection of CANDU nuclear power plant components," N285.4-09 (2009)

2.
AECL, "Design report fuel channel stress analysis Wolsong-234 NPP," 86-31100-SR-001 (1996)

3.
KHNP, "Report on AECL education/training for AFCIS in Canada," Oversea Education Report, KEOCO (2001)

4.
KHNP-CRI, "Development of base technology for fuel channel inspection system in CANDU reactors," Final Research Report, TR-E10NJ11, 2011. 7

5.
KHNP-CRI, "Development of fuel channel inspection system in CANDU," Final Research Report, TR-E11TX09, 2014. 10

6.
H. J. Lee, S. N. Choi, C. H. Cho, H. J. Yoo and G. Y. Moon, "Nondestructive examination of PHWR pressure tube using eddy current technique," Journal of the Korean Society for Nondestructive Testing, Vol. 34, No. 3, pp. 254-259 (2014) crossref(new window)

7.
CSA Code, "Technical requirements for inservice evaluation of zirconium alloy pressure tubes in CANDU reactors," N285.8-05 (2005)

8.
KHNP-CRI, "Development of the in-service evaluation system for pressure tubes in CANDU reactors," Final Research Report, A06NT01, 12 (2009)

9.
CNL, "Fuel channel periodic inspection: Wolsong-4, 2015 August- Preliminary Report," 153-31100-PIP-015, Rev. 0 (2015)