JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Derivation of Development Length in Pretensioned Prestressed Concrete Members
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Derivation of Development Length in Pretensioned Prestressed Concrete Members
;;;;
  PDF(new window)
 Abstract
In pretensioned concrete structures, bond between prestressing steel and concrete is an essential component to ensure the integrity of a pretensioned member. The anchorage and development of the prestressing force depend exclusively on bond. The purpose of this study is to investigate the characteristics of bond and development length between pretensioned steel and concrete. To resolve the controversy over the adequacy of the current code provision on development length of prestressing strands, a comprehensive test program has been scheduled and twenty four rectangular prestressed concrete beams have been tested to determine development length. Major test variables include diameter of strands (12.7mm, 15.2mm) and concrete covers (3cm, 4cm, 5cm). The test results indicate that the development length based on the bond stress-slip relation. The proposed model can evaluate realistically the development length of pretensioned prestressed concrete members and can be the good basis for the future basis of code equations on development length of PSC members.
 Keywords
development length;pretension;flexural bond length;bond-slip relationship;
 Language
Korean
 Cited by
 References
1.
Standard Specifications for Highway Bridgeds(16th Edition.), 1996.

2.
ACI Committee 318, 1995.

3.
ACI Material Journal, 1993. pp.228-235

4.
ACI Journal, 1976. vol.73. 8, pp.457-464

5.
PCI Journal, 1992. pp.60-71

6.
PCI Journal, 1993. pp.86-93

7.
PCI Journal, 1992. pp.66-73

8.
PCI Journal, 1993. pp.52-66

9.
Ph.D. Dissertation, 1992.

10.
PCI Journal, 1977. vol.22. 5, pp.54-65