Construction Cost Estimate Model Based on Process Costing System
Yi, Kyoo-Jin;
 
 Abstract
Previous researches related to the estimation of construction cost are mainly based on the cost of materials and direct labour, and researches on the relationship between material and other account items are not much. Due to the recent development of construction machinery, the trend is that the percentage of labour cost is decreasing. With this trend of labour cost reduction and the growing proportion of outsourcing cost, research on the relationship among cost account items is required to be renewed. This study conducts a regression analysis based on the process costing system between 1989 and 2013, and proposed a cost estimation model for general construction, civil construction, and building construction. A comparison of the actual values and model-estimated values proves the validity of the estimation model.
 Keywords
Construction cost;Labour cost;Cost estimation;Regression analysis;
 Language
Korean
 Cited by
 References
1.
Kang, T., & Park, C. (2004). Indirect labor cost estimation system in the public building projects, Journal of the Architectural Institute of Korea, Structure & Construction Section, 20(5), 121-128.

2.
Song, K., Jung, E., & Im, C. (2006). A Study on the correlation analysis of the item of expenditure using ISM method, Journal of the Architectural Institute of Korea, Structure & Construction Section, 22(5), 153-160.

3.
Lee, H., Lee, E., & Kim, Y. (2013), Time series analysis and forecast for labor cost of actual cost data, Korean Journal of Construction Engineering and Management, 14(4), 24-34. crossref(new window)

4.
Yim, J., Park, J., & Kim, O. (2014). Presumption method for optimum correction rate of total construction cost using the median based on historical data analysis in public office buildings, Journal of the Korea Institute of Buliding Construction, 14(5), 415-210. crossref(new window)

5.
Jung, S., & Lee, H. (2001). A study on the method of estimating indirect labor cost rate using the analysis of cost items in complete works, Korean Journal of Construction Engineering and Management, 2(2), 81-89.

6.
Becker, T. C., Jaselskis, E. J., & El-Gafy, M. (2014). Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs, Journal of Construction Engineering and Management, ASCE, 140(6).

7.
Ji, S. H., Park, M., & Lee, H. S., (2010). Data Preprocessing- Based Parametric Cost Model for Building Projects: Case Studies of Korean Construction Projects, Journal of Construction Engineering and Management, ASCE, 136(8), 844-853. crossref(new window)