Advanced SearchSearch Tips
A Study on New Power Business Model Using Power Information Technology
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
A Study on New Power Business Model Using Power Information Technology
Bae, Sung-Hwan; Kim, Ja-Hee; Lim, Han-Seung;
  PDF(new window)
The Korea Electric Power Corporation (KEPCO) recorded 2.9 trillion won deficit in the aftermath of the world financial crisis. KEPCO is trying to escape from the business crisis in every way; however, it is impossible to make huge profit by selling electricity alone. Overseas electrical utilities make profits by selling gas and heat along with electricity. However, it is difficult for KEPCO to enter the gas and the heat selling market because other public companies are already dealing with them. In this situation, improving the business is possible when KEPCO develops a new business model and creates added value using Korean advanced Power IT combined with electricity. This study shows a new business model using Power IT, based on a survey targeting managers in KEPCO branch office and electrical engineers in the field. We hope the new business model suggested in this study is adapted to the real field to create high value in the future.
Business Model;Power IT;Future Service;Smart grid;
 Cited by
스마트 그리드를 위한 원격검침 표준 프로토콜 인증 시스템 구축과 표준화에 관한 연구,최인지;박병석;최효열;명노길;이상염;

한국통신학회논문지, 2012. vol.37. 1B, pp.75-85 crossref(new window)
스마트그리드 환경에서 효율적인 주소 할당 방법과 라우팅 알고리즘,임송빈;김화성;오영환;

한국컴퓨터정보학회논문지, 2012. vol.17. 10, pp.89-98 crossref(new window)
Case Study on Auto Meter Reading Protocol Certificate System for Smart Grid and Standardization, The Journal of Korea Information and Communications Society, 2012, 37, 1B, 75  crossref(new windwow)
Analysis of Consumer Preferences for Electric Vehicles, IEEE Transactions on Smart Grid, 2013, 4, 1, 437  crossref(new windwow)
An Effective addressing assignment method and Its Routing Algorithm in Smart Grid Environments, Journal of the Korea Society of Computer and Information, 2012, 17, 10, 89  crossref(new windwow)
Y. B. Shim, B. T. Jang, and D. Y. Oh, “KEPCO Enhanced Power Grid for 2030”, KEPRI, Aug. 2007.

J. M. Oh, D. S. Kim, and D. Y. Kim, “Feasibility study on the development of the next generation transparent solar cells”, KEPRI, Jul. 2007.

H. C. Lim, S. M. Park, and Y. S. Yeu, “Feasibility study on the development of fuel cell for power generation”, KEPRI, Aug. 2007.

T. H. Sung, Y. H. Han, and H. C. Cho, “Feasibility study on the development of energy storage systems for large capacity application”, KEPRI, Jul. 2007.

I. G. Seong, B. S. Lee, and J. M. Jeung, “Feasibility study on the development of smart distribution system”, KEPRI, Jul. 2007.

H. B. Nam, I. G. Seong, and G. G. Youn, “1 step Report on Development of intelligent distribution management system”, MOCIE, Nov. 2008.

Y. B. Shim, “1 step Report on Development of prototype for advanced substation automation system based on the digital control technology”, KEPRI, Sep. 2008.

D. W. Hyun, and G. H. Kim, “1 step Report on Development of PLC ubiquitous technology”, KERI & KEPRI, Sep. 2008.

H. J. Lee, “Midterm Report on Development of energy management system for microgrid”, KEPRI, Nov. 2008.

T. G. Kim, J. W. Jang and N. H. Goak, “1 step Report on Development of intelligent transmission network monitoring and operation system”, KEPRI, Oct. 2008.

N. H. Goak, B. H. Jang, S. Y. Kim, J. S. Youn, and Y. H. Kim, “Third Year Report on IT based control system for bulk power transmission”, KEPRI, Nov. 2008.

S. C. Geun, J. Y. Kim, and I. G. Seong, “Present Status on Technology Development of Smart Distribution System”, The Proceedings of KIEE, Vol. 57, No. 12, pp.43-50, Dec. 2008.

“Master Implementation Plan of Power Line Communication Business”, KEPCO, Nov. 2007.