JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Power Interruption Costs to Commercial Customers of Electricity in Korea
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Power Interruption Costs to Commercial Customers of Electricity in Korea
Kim, Dong-Sub; Kim, Kil-Sin;
  PDF(new window)
 Abstract
This paper presents the result of the estimation of the power interruption costs of Korean commercial customers. Commercial customers are usually located in urban areas and considered very important because a power interruption on them can expand to additional damage to related users. Their power interruption costs were calculated through a survey with the process of data selection. Also, the power interruption cost for each customer's business type was calculated and compared with that of foreign cases.
 Keywords
Interruption cost;Customer survey;Commercial customer;Microscopic method;KSIC;
 Language
English
 Cited by
 References
1.
M. J. Sullivan, T. Vardell, and A. Vojadni, "Interruption Costs, Customer Satisfaction and Expectations for Service Reliability", IEEE Trans. Power Systems, vol. 11, no. 2, pp. 989-995, May 1996. crossref(new window)

2.
M. Munasinghe, M. Gellerson, "Economic criteria for optimizing power systems reliability levels", Bell J. Econ., pp. 353-365, Spring 1979.

3.
Ponemon Institute, "2013 Cost of Data Center Outages", Dec. 2013.

4.
G. Wacker, R. Billinton, "Customer cost of electric service interruptions", IEEE Proc, vol. 77, Issue. 6, pp. 919-930, Jun. 1989. crossref(new window)

5.
EPRI, "Outage Cost Estimation Guidebook", EPRI TR-106082, Dec. 1995.

6.
R. Ghajar, R. Billinton, E. Chan, "Distributed nature of residential customer outage costs", IEEE Trans. Power Systems, vol. 11, no. 3, pp. 1236-1244, Aug. 1996. crossref(new window)

7.
D. J. Sheskin, "Handbook of Parametric and Nonparametric Statistical Procedures: 3rd Edition", CRC Press, Feb. 2013.

8.
KERI, "A Technology to Evaluate Reliability and Economy of Distribution Power System under Competition Structure", pp. 79-212, Aug. 2004.

9.
Y. H. Kim, "Evaluation of the Microscopic Customer Interrupt Cost of Commerce", KIEE Summer Conference, pp.196-197, 2010.

10.
M. J. Sullivan, M. Mercurio, J. Schellenberg, "Estimated Value of Service Reliability for Electric Utility Customers in the United States", LBNL-2132E, Jun. 2009.

11.
M. Sullivan, M. Perry, "Pacific Gas & Electric Company's 2012 Value of Service Study", May 2012

12.
Gerd H. Kjolle, Knut Samdal, etc, "Customer Costs Related to Interruptions and Voltage Problems: Methodology and Results", IEEE Trans. Power Systems, vol. 23, no. 3, pp. 1030-1038, Aug. 2008 crossref(new window)