The renewable energies such as photovoltaic power, wind power and biomass have grown to a greater extent as decarbonization techniques. The renewable energies are interconnected to power systems (or electrical grids) in order to increase benefits from economies of scale, and the extra attention is focused on the Grid Code. A grid code defines technical parameters that power plants must meet to ensure functions of power systems, and the grid code determined by considering power system characteristics is various across the country. Some TSO (Transmission System Operator) and ISO (Independent System Operator) have issued grid code for wind power and the special requirements for offshore wind farm. The main purpose of the above grid code is that wind farm in power systems has to act as the existing power plants. Therefore wind farm developer and wind turbine manufacturer have great difficulty in grasping and meeting grid code requirements. This paper presents the basic understanding for grid codes of developed countries in the wind power and trends of those technical requirements. Moreover, in grid code viewpoint, the active power control of wind power is also discussed in details.
Grid code;Wind Power Generator (WPG);Wind Power Plant (WPP);Active power control;Frequency control;
 Cited by
T. Ackermann (Editor), Wind Power in Power Systems. (2ed.) John Wiley & Sons, 2012.

Gimenez Alvarez J.M and Molina, M.G, “Technical and Regulatory Exigencies for Grid Integration of Wind Generation”, Cuarto Congreso Nacional, 10-252, 2011.

Inigo Martinez de Alegrıa, Jon Andreua, Jose Luis Martın, Pedro Ibanez, Jose Luis Villate, Haritza Camblong, "Connection requirements for wind farms: A survey on technical requierements and regulation", ELSEVIER, 2006.

Mr Stamatios Chondrogiannis, Dr Mike Barnes, Dr Mark Osborne, Dr Liangzhong Yao, Mr Masoud Bazargan, Mr. Antony Johnson, “GRID COMPLIANT AC CONNECTION OF LARGE OFFSHORE WIND FARMS USING A STATCOM” .

Seung-Il Moon, Gi-Chan Pyo, and Jin-Woo Park, "Study on development of Grid code and operation scheme of Jeju Island with high wind penetration".

ECAR Ltd., “Wind Integration: International Experience WP2: Review of Grid Codes”, 2011.

Romain Castel, “Connection of offshore wind farms to the grid in Europe and Brittany”, 2010.

Elforsk rapport, "DC Connected Wind Farm", 2008.

Jacob Aho, Andrew Buckspan, Jason Laks, Paul Fleming, Yunho Jeong, “A Tutorial of Wind Turbine Control for Supporting Grid Frequency through Active Power Control”, NREL, 2012.

A. Basit, A. D. Hansen, I. D. Margaris, J. C. Hansen, “A Review of Grid Requirements for Wind Farm in Denmark and China”, China wind power 2012 conference, 2012.

ENERGINET, “Technical regulation 3.2.5 for wind power plants with a power output greater than 11 kW”, 2010.

Tennet, “Grid Code-High and extra high voltage –”, 2012.

Tennet, “Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH”, 2012.

BWE, “German Grid Code Requirements”, 2008.

KEPCO, “The provision for using transmission and distribution systems”, 2013.

Korean ministry of trade, industry and energy, “The standard for electrical power system reliability and power quality”, 2012.

EWEA, “Generic Grid Code Format for Wind Power Plants”, 2009.