1.
A. Laskar, C.V.R. Murty, "Challenges before Construction Industry in India", Proceedings of the 7th National Conference on Construction, New Delhi, India, 2004.
2.
K. Ramaswamy, S.N. Kalidindi, "Waste in Indian Building Construction Projects" 17th Annual Conference of the International Group for Lean Construction. Taipei, Taiwan, 15-17 Jul 2009.
3.
World Bank, "India: Indian Road Construction Industry Capacity Issues, Constraints & Recommendations", 2008.
4.
H.D. Khanh, S.Y. Kim, "Barriers of Last Planner System: A Survey in Vietnam Construction Industry", KICEM Journal of Construction Engineering and Project Management, vol. 3, no. 4, pp. 5-11, 2013.
5.
H.D. Khanh, S.Y. Kim, "Practitioners" Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects", KICEM Journal of Construction Engineering and Project Management, vol. 4, no. 3, pp. 1-12, 2014.
6.
A.A. Banawi, M. Bilec, "Applying Lean, Green, and Six-Sigma Framework to Improve Exterior Construction Process in Saudi Arabia", KICEM Journal of Construction Engineering and Project Management, vol. 4, no. 2, pp. 12-22, 2014.
7.
A. AlSehaimi, L. Koskela, and P. Tzortzopoulos, "The need for alternative research approaches in construction management: the case of delay studies", Journal of Management in Engineering, Vol. 29 No. 4, pp. 407-413, 2013
8.
L. Koskela, "Lean production in construction", in Lean Construction, L. Alarcon, Editor, A.A.Balkema: Rotterdam, pp. 1-10, 1997.
9.
G. Ballard, and G. Howell, "Implementing Lean Construction: Stabilizing work flow", in Lean Construction, L. Alarcon, Editor A.A.Balkema: Rotterdam. pp. 105-114, 1997.
10.
A. Serpell, A. Venturi, and J. Contreras, "Characterization of waste in building construction projects", in Lean Construction, L. Alarcon, Editor, A.A.Balkema: Rotterdam, pp. 68-81, 1997.
11.
G. Ballard, "The Last Planner System of production control", University of Birmingham, England, 2000.
12.
C. Fiallo, and V. Revelo, "Applying LPS to a construction project: a case study in Quito, Ecuador", Proceedings of the 10th IGLC Conference, Gramado, 2002.
13.
E. Johansen, and G. Porter, "An experience of introducing LPS into a UK construction project", Proceedings of the 11th IGLC Conference, Blacksburg, VA, 2003
14.
S. Gao, and S. Low, The Last Planner System in China's construction industry - A SWOT analysis on implementation, International Journal of Project Management, Volume 32, Issue 7, October 2014.
15.
G. Ballard, "Phase Scheduling", Lean Construction Institute, 2000
16.
L.F. Alarcon, "Tools for the identification and reduction of wastes in construction projects", in Lean Construction, L. Alarcon, Editor A.A.Balkema: Rotterdam, pp. 374-388, 1997.
17.
A. Bhatla, "Implementation of Lean Construction in IIT Guwahati." bachelor BTP REPORT, Indian Institute of Technology Guwahati, Guwahati, India, 2010.
18.
K. Charmaz, "Constructing Grounded Theory: A Practical Guide through Qualitative Analysis". Sage, Thousand Oaks, CA., 2006
19.
J. Green, and N. Thorogood, "Qualitative Methods for Health Research." Sage, Thousand Oaks, CA., 2004
20.
A. O. AlSehaimi, P. T. Fazenda, and L. Koskela, "Improving construction management practice with the Last Planner System: a case study." Engineering, Construction and Architectural Management, 21(1), 51 - 64, 201