JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Who Should Control the Integrated Management System for Sewerage Facilities in the Upper Reaches of Multi-Purpose Dams in Korea?
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
  • Journal title : Environmental Engineering Research
  • Volume 15, Issue 2,  2010, pp.99-103
  • Publisher : Korean Society of Environmental Engineering
  • DOI : 10.4491/eer.2010.15.2.099
 Title & Authors
Who Should Control the Integrated Management System for Sewerage Facilities in the Upper Reaches of Multi-Purpose Dams in Korea?
Park, Kyoo-Hong; Kim, Hyung-Joon;
  PDF(new window)
 Abstract
Integrated management systems (IMS) that control entire sewerage facilities in the upper reaches of multi-purpose dams are being constructed for their efficient operation and management. However, because the IMS installed in a watershed belong to several local government bodies, significant conflict would be expected between stakeholders in the process of deciding who should control the IMS after completion of the construction that was initially implemented under the support of central government. The objective of this study was to suggest a decision making to determine who should control the IMS for sewerage facilities in the upper reaches of multipurpose dams in Korea, using the analytic hierarchy process (AHP). Three alternatives were selected to determine who should control the IMS for sewerage facilities: commissioning to public corporations, commissioning to private corporations, and a role-sharing partnership. In using the AHP technique, the emphasis was on comparing public interests, economics, efficiency, sustainability, specialty, grievance mediation and receptiveness. As a result, building a role-sharing partnership received the highest score. Commissioning to a special institute was also suggested as an alternative as this showed a score similar to that of building a role-sharing partnership.
 Keywords
Sewerage;Integrated management system;Analytic hierarchy process;
 Language
English
 Cited by
1.
댐상류 하수도시설의 통합운영관리방안에 관한 연구(I) - 통합관리전문기술지원단의 운영방안에 대하여 -,박규홍;김형준;안충희;최주행;

상하수도학회지, 2011. vol.25. 1, pp.23-29
 References
1.
Korean Ministry of Environment. Integrated management system for sewerage facilities and BTL project for sewage pipe in Korea. Korea Environ. Policy Bull. 2005;III (1).

2.
Park K, Jin YS, Lee S. Feasibility study on sewerage rehabilitation project in upper reaches of dams Andong-Imha. Final report to Environmental Management Corporation, Korea; 2003 (in Korean).

3.
Park K, Jeong DH, Jin YS, Kim J. Application of benefit transfer method in planning the construction of the integrated sewerage system at the catchment areas of dams in Korea. In: Proceedings of International Conference on Water Economics, Statistics, and Finance; 2005 Jul 8-10; Rethymno, Greece: International Water Association.

4.
Saaty TL. Analytical hierarchy process: planning, priority setting, resource allocation. New York: McGraw-Hill; 1980.