JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project
Kim, Sooyong; Kim, Sunghyun; Yang, Jinkook;
  PDF(new window)
 Abstract
High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are `Operation plan of material lifting`, `Outrigger & Belt Truss Construction`, `Foundation work plan of high-rise building` and `Considering a Structure concept of high-rise building`.
 Keywords
Preference Ranking Organization METHod for Enrichment Evaluation (PROMETHEE);Risk;Focus Group Interview (FGI);High-Rise Construction;
 Language
Korean
 Cited by
 References
1.
Brans, J. and P. Vincke. (1985). "A Preference Ranking Organization Method(the PROMETHEE Method for Multi Criteria Decision-making)", Management Science, 31(6), pp. 647-656. crossref(new window)

2.
Goums, M. and Lygerou, V. (2000). "An Extension of the PROMETHEE method for decision making in fuzzy environment: Ranking of alternative energy exploitation projects", European Journal of Operational Research, 123, pp. 606-613. crossref(new window)

3.
Huylenbroeck, G. V. (1995). "The Conflict Analysis Method: bridging the gap between ELECTRE, PROMETHEE and ORESTE", European Journal of Operational Research, 82, pp. 490-502. crossref(new window)

4.
Keyser, W.D. and Peeters, P. (1996). "A note on the use of PROMETHEE multicriteria methods", European Journal of Operational Research, 89, pp. 457-461. crossref(new window)

5.
Lee. J. Y. (2010). "Analysis of the schedule risk importance using PROMETHEE in building construction management", Master Thesis, Kyungwon University.

6.
Moon, J., Park, M., and Lee, H., Jung, M. (2014). "Study on Optimization for Construction Vertical Lifting with Tarnsfer Operation for Super Highrise Buildings" Korean Journal of Construction Engineering and Management, KICEM, 15(6), pp. 53-62.

7.
Project Management Institute (2004) "A Guide To The Project Management Body Of Knowledge", Project Management Institute (PMI).

8.
Shin, J., Park, and Kwon, S. (2013). "Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building" Korean Journal of Construction Engineering and Management, KICEM, 14(5), pp. 153-163. crossref(new window)