JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Development of Performance Prediction Method for Bridge and Tunnel Management Decision-making
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Development of Performance Prediction Method for Bridge and Tunnel Management Decision-making
Lee, Dong-Hyun; Kim, Ji-Won; Jun, Tae-Hyun; Jeong, Won-Seok; Park, Ki-Tae;
  PDF(new window)
 Abstract
In this study, using the Cost Prediction Model and Performance Prediction Model have developed a way to estimate future management costs and performance for bridge and tunnel by Network Level. Studies to date have primarily focused on the single facility, it is difficult to apply to the analysis of the Network Level. This study, items used as an index of `Special Act for the Safety Control of Public Structures` was added to Usability and Functionality to Status. Action period and annual budget for each facility can be estimated through the Basic and Advanced analysis. In addition, we verified the technical feasibility through case analysis.
 Keywords
Bridge;Tunnel;Facility management;Cost Prediction Model;Performance Prediction Model;Network level;
 Language
Korean
 Cited by
 References
1.
Korea Expressway Corporation (2014), A Study of LCC DB Improvement & System Application in Highway Design Stage, 47-86.

2.
Kim, J.W., and Park, C.W. (2014), Evaluation of Repair/Rehabilitation Characteristic of Highway Bridges, 170-194.

3.
Ministry of Land, Infrastructure, and Transport (2013), 5th Transport Investment Appraisal Guideline, 291-297.

4.
Kang, H.T. (2009), Development of Asset Management System's Framework, Korea Expressway Corporation Research Institute, 176-177.

5.
Korea Infrastructure Safety and Technology Corporation (2006), Development of Life Cycle Cost Estimation Models and System for Underground Road Structures(Tunnel and Underground Motorway), 99-100.

6.
NCHRP REPORT 551 (2005), Performance Measures and Targets for Transportation Asset Management, TRR, 78-82.