JOURNAL BROWSE
Search
Advanced SearchSearch Tips
A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works -
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
  • Journal title : Journal of KIBIM
  • Volume 5, Issue 3,  2015, pp.19-32
  • Publisher : Korean Institute of Building Information Modeling
  • DOI : 10.13161/kibim.2015.5.3.019
 Title & Authors
A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works -
Lee, Joo-Sung; Ham, Nam-Hyuk; Kim, Jae-Jun;
  PDF(new window)
 Abstract
For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase`s productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.
 Keywords
BIM(Building Information Modeling);Construction BIM;BIM PxP(Project Execution Plan);Reinforced Concrete;
 Language
Korean
 Cited by
1.
국내 건설회사 BIM 프로젝트의 사례 분석을 통한 BIM전략 수립 방안 - 2009년부터 2015년까지 프로젝트의 BIM Use를 중심으로 -,조용현;이주성;함남혁;김재준;

한국BIM학회 논문집, 2016. vol.6. 2, pp.1-11 crossref(new window)
 References
1.
Kim, K-H, Kim, K-H, Lee, Y-S, Kim, J-J (2008), "A Study about Influence of Risk Factors in Relation to Construction Cost Increase and Schedule Delay on the Reinforced Concrete Construction", Journal of the Architecture Institute of Korea, Vol. 24 No. 5, pp. 165-172.

2.
Kim, M-C, Son, C-B (2010) "Analyzing the Level and Influence Factors for Work Performance of Field Managers in Specialty Contractors", Journal of the Architecture Institute of Korea, Vol. 26 No. 5, pp. 133-140.

3.
Kim, M-C, Son, C-B (2010) "A Status Analysis on the Organization and Service for Job Site Management of Specialty Contractors in Reinforced Concrete Work", Journal of the Architecture Institute of Korea, Vol. 26 No. 4, pp. 151-158.

4.
Kim, S-Y, Min, C-H, Kim, H-S, Kim, C-H, Kang, I-S (2011) "Development of BIM Operation Model for the Construction Phase by Analyzing BIM Technology", Proceeding of the Korea Institute of Construction Engineering and Management, pp. 333-334.

5.
Kim, Y-H, Lee, J-S, Oh, J-G, Kim, J-J (2013), "A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM", Journal of the Korea Institute of Construction Engineering and Management, Vol. 14 No. 2, pp. 22-34.

6.
Park, K-H, Son, C-B (2010) "Analyzing the Level and Influence Factors for Work Performance of Field Managers in General Construction Companies", Journal of the Korea Institute of Construction Engineering and Management, Vol. 11 No. 3, pp. 115-124. crossref(new window)

7.
Park, J-H, Jeon, H-B, Cho, K-M, Hong, T-H, Koo, K-J, Hyun, C-T (2008), "Improvement Factors for Reinforced Concrete Firm against Removing the restriction of Construction Market Activation", Journal of the Korea Institute of Construction Engineering and Management, Vol. 8 No. 1, pp. 118-125.

8.
Song, S-M, Seo, J-H, Lee, C-H, Kim, Y-S, Cho, H-H (2011), "A Deduction of Key Work for Service Guide of Construction Manager in Construction Project", Journal of the Korea Institute of Construction Engineering and Management, Vol. 12 No. 4, pp. 11-20.

9.
Ahn, Y-S, Lee, L-H (1993), "Productivity Analysis for Formwork Operation of Concrete Structure", Journal of the Korea Concrete Institute, Vol. 5 No. 1, pp. 175-181.

10.
Ahn, J-B, Song, Y-O, Choi, Y-K (2009), "Quality Risk Management System for Steel Structure Construction", Journal of the Architecture Institute of Korea, Vol. 25 No. 4, pp. 209-217.

11.
Yoon, Y-S, Seo, S-W, Park, M-S, Jang, M-H (2008), "Construction Process based Schedule Risk Management System", Journal of the Korea Institute of Construction Engineering and Management, Vol. 9 No. 4, pp. 101-110.

12.
Lee, J-H, Lee, H-S, Kim, M-H (1996), "A Scheduling Method of Reinforced Concrete Construction in Apartment Housing Projects Focused on Formwork Crews", Journal of the Architecture Institute of Korea, Vol. 12 No. 4, pp. 261-269.

13.
Lee, H-C, Lim, S-Y, Yeo, S-K, Ko, S-S (2009), "A Study on the Work Delay Factors of Reinforced Concrete Work in Apartment House Construction", Journal of the Korea Institute of Building Construction, Vol. 8 No. 2, pp. 55-61.