Advanced SearchSearch Tips
Semi-submersible Drilling Rig and Drilling Equipment
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Semi-submersible Drilling Rig and Drilling Equipment
An, Byoung-Ky; Oh, Hyun-Jung;
  PDF(new window)
An exploration well is drilled where oil or gas potential is shown by a seismic survey and interpretation. With the advance of drilling technology, most of the easily accessible oil had been developed by the end of the 20th century. To satisfy the ever increasing demand for oil, and bolstered by high oil prices, the major oil companies started to drill in deep water, which requires a deep offshore drilling unit. Offshore drilling units are generally classified by their maximum operating water depth. Many semi-submersible rigs have been purpose-designed for the drilling industry as the allowable drilling water depth has become deeper by the developed technics since the first semi-submersible was launched in 1963. Semi-submersible rigs are commonly used for shallow to deep water up to 3,000 m. Drilling equipment such as a top drive, blowout preventer, drawworks and power system, mud circulation system, and subsea wellhead system are explained to help with an understanding of offshore drilling procedures in the oil and gas fields. The objective of this paper is to introduce the main components of a semi-submersible rig and, by doing so, to raise the awareness of offshore drilling, which accounts for over 30% of the total oil production and will continue to increase.
Drilling;Semi-submersible;Top drive;Drawworks;BOP(Blow out preventer);
 Cited by
CFD를 이용한 머드 탱크 2축 교반기의 회전방향에 따른 교반성능 연구,임효남;이희웅;이인수;최재웅;

한국해양공학회지, 2014. vol.28. 2, pp.111-118 crossref(new window)
Agitation Performance Study of 2-shafts Agitator Rotate Directio in the Mud Tank Based on CFD, Journal of Ocean Engineering and Technology, 2014, 28, 2, 111  crossref(new windwow)
Baker, R., 1998. Diesel Engines And Electric Power, Unit I, Lesson 8, Third Edition, 1-4.

Bork, K.R., 1995. The Rotary Rig, Unit I, Lesson 1, Fourth Edition, 47-58.

Davis, L.D., 1995. Rotary, Kelly, Swivel, Tongs, And Top Drive, Unit I, Lesson 4, First Edition, 1-8.

Dyke, K,V., 1995. The Drawworks and The Compound, Unit I, Lesson 6, First Edition, 1-6.

McGrae, H., 2003. Marine Riser Systems and Subsea Blowout Preventers, Unit V, Lesson 10, First Edition, 9-62.

Kruse, C.F., 1976. Jacking Systems and Rig Moving Procedures, Lessons in rotary drilling Unit V-Lesson 4, 1-17.

Tyson, B., 2004. Buoyancy, Stability, and Trim, Unit V, Lesson 3, Second Edition, 6-9.