JOURNAL BROWSE
Search
Advanced SearchSearch Tips
A Study on the RAMS Activities and Practices for assuring Safety of the Centralized Traffic Control System of Urban Railway
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
A Study on the RAMS Activities and Practices for assuring Safety of the Centralized Traffic Control System of Urban Railway
Choi, Yo Chul;
  PDF(new window)
 Abstract
The Centralized Traffic Control(CTC) System of Urban Railway is an element(subsystem) of the Urban Railway system to aim safety operation and efficient management of rolling stock in accordance with a train scheduling program in train operation ways. That's why the CTC System must be developed considering systematic and safety-guaranteed methods such as RAMS(Reliability, Availability, Maintainability, and Safety) refereed to IEC standards. The CTC System is consists of rolling stock, signaling, power supply, communication, and mechanical equipment and preforms control and remote monitoring functions. The technical activities considering safety process are very important at such an early stage of development in a railway project. This paper introduces RAMS activities and an independent safety assessment by Party focused on a safety applied to a development of the CTC system of Urban Railway and proposes the experiences as well practices.
 Keywords
RAMS Process;Reliability;Availability;Maintainability;Safety;Systems Engineering;Railway Project;Urban Railway;Centralized Traffic Control(CTC);
 Language
Korean
 Cited by
 References
1.
https://www.ulrt.co.kr/safety/safety_04.do

2.
IEC 62278, "Railway applications-Specification and demonstration of reliability, availability, maintainability and safety(RAMS)" 2002. The International Electrotechnics Commission(IEC)

3.
IEC 62279, "Railway applications-Communications, signaling and processing systems-Software for railway control and protections systems", 2002, The International Electrotechnical Commission(IEC)

4.
http://www.lsis.com/product/product.aspx?d1=A05&c=P00173

5.
S/W Safety Management Plan, 7Line CTC project, SMRT, 2011

6.
S/W Quality Activity Plan, 7Line CTC project, SMRT, 2011

7.
S/W Functional Hazard Analysis Report, 7Line CTC project, SMRT, 2011