Shear behavior and analytical model of perfobond connectors
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Shear behavior and analytical model of perfobond connectors
Zheng, Shuangjie; Liu, Yuqing; Yoda, Teruhiko; Lin, Weiwei;
 Abstract
In steel and concrete composite girders, the load transfer between the steel beam and the concrete slab is commonly ensured by installing shear connectors. In this paper, to investigate the nonlinear behavior of perfobond connectors, a total of 60 push-out specimens were fabricated and tested with the variables for the hole diameter, the concrete strength, the thickness of concrete slab, the diameter, strength and existence of perforating rebar, the thickness, height and distance of perfobond ribs. The failure mode and the load-slip behavior of perfobond connectors were obtained. A theoretical model was put forward to express the load-slip relationship. Analytical formulas of shear capacity and peak slip were also proposed considering the interaction between the concrete dowel and the perforating rebar. The calculation results of the proposals agreed well with the experimental values.
 Keywords
composite bridge;perfobond connector;push-out test;load-slip behavior;theoretical model;
 Language
English
 Cited by
 References
1.
Ahn, J.H., Lee, C.G., Won, J.H. and Kim, S.H. (2010), "Shear resistance of the perfobond-rib shear connector depending on concrete strength and rib arrangement", J. Constr. Steel Res., 66(10), 1295-1307. crossref(new window)

2.
Al-Darzi, S.Y.K., Chen, A.R. and Liu, Y.Q. (2007), "Finite element simulation and parametric studies of perfobond rib connector", Am. J. Appl. Sci., 4(3), 122-127. crossref(new window)

3.
Candido-Martins, J.P.S., Costa-Neves, L.F. and Vellasco, P.C.G.S. (2010), "Experimental evaluation of the structural response of Perfobond shear connectors", Eng. Struct., 32(8), 1976-1985. crossref(new window)

4.
EN 1994-1-1 (2004), Eurocode 4: Design of composite steel and concrete structures, Part 1-1: General rules and rules for buildings, European Committee for Standardisation (CEN), Brussels, Belgium.

5.
FIB (2010), FIB bulletin 65: Model code 2010 - Final draft, (Volume 1), International Federation for Structural Concrete, Lausanne, Switzerland.

6.
Furuichi, K., Taira, Y. and Yamamura, M. (1998), "Experimental study on shear strength of shear connectors using perforated plate", Annual Report; Kajima Technical Research Institute No. 46, Tokyo, Japan.

7.
Hosaka, T., Mitsuki, K., Hiragi, H., Ushijima, Y., Tachibana, Y. and Watanabe, H. (2000), "An experimental study on shear characteristics of perfobond strip and its rational strength equations", J. Struct. Eng., JSCE, 46A, 1593-1604.

8.
Johnson, R.P. (2000), "Resistance of stud shear connectors to fatigue", J. Constr. Steel Res., 56(2), 101-116. crossref(new window)

9.
JSCE (2009), Standard specifications for hybrid structures, Japan Society of Civil Engineers, Tokyo, Japan.

10.
Kim, S.H. and Choi, J.H. (2010), "Experimental study on shear connection in unfilled composite steel grid bridge deck", J. Constr. Steel Res., 66(11), 1339-1344. crossref(new window)

11.
Kim, S.H., Lee, C.G., Ahn, J.H. and Won, J.H. (2011), "Experimental study on joint of spliced steel-PSC hybrid girder, part I: proposed parallel-perfobond-rib-type joint", Eng. Struct., 33(8), 2382-2397. crossref(new window)

12.
Lee, P.G., Shim, C.S. and Chang, S.P. (2005), "Static and fatigue behavior of large stud shear connectors for steel-concrete composite bridges", J. Constr. Steel Res., 61(9), 1270-1285. crossref(new window)

13.
Leonhardt, F., Andra, W., Andra, H.P. and Harre, W. (1987), "Neues, vorteilhaftes Verbundmittel fur Stahlverbund-Tragwerke mit hoher Dauerfestigkeit", Betonund Stahlbetonbau, 82(12), 325-331. crossref(new window)

14.
Lin, Z., Liu, Y. and He, J. (2014), "Behavior of stud connectors under combined shear and tension loads", Eng. Struct., 81, 362-376. crossref(new window)

15.
Liu, Y., Xin, H., He, J., Xue, D. and Ma, B. (2013), "Experimental and analytical study on fatigue behavior of composite truss joints", J. Constr. Steel Res., 83, 21-36. crossref(new window)

16.
Mazoz, A., Benanane, A. and Titoum, M. (2013), "Push-out tests on a new shear connector of I-shape", Int. J. Steel Struct., 13(3), 519-528. crossref(new window)

17.
Medberry, S.B. and Shahrooz, B.M. (2002), "Perfobond shear connector for composite construction", Eng. J. AISC, 39(1), 2-12.

18.
Nakamura, S., Momiyama, Y., Hosaka, T. and Homma, K. (2002), "New technologies of steel/concrete composite bridges", J. Constr. Steel Res., 58(1), 99-130. crossref(new window)

19.
Oehlers, D.J. and Coughlan, C.G. (1986), "The shear stiffness of stud shear connections in composite beams", J. Constr. Steel Res., 6(4), 273-284. crossref(new window)

20.
Oguejiofor, E.C. and Hosain, M.U. (1994), "A parametric study of perfobond rib shear connectors", Can. J. Civil Eng., 21(4), 614-625. crossref(new window)

21.
Shariati, A., Shariati, M., Ramli Sulong, N.H., Suhatril, M., Arabnejad Khanouki, M.M. and Mahoutian, M. (2014), "Experimental assessment of angle shear connectors under monotonic and fully reversed cyclic loading in high strength concrete", Con. Build. Mater., 52, 276-283. crossref(new window)

22.
Zellner, W. (1987), "Recent designs of composite bridges and a new type of shear connectors", Proceedings of the ASCE Engineering Foundation Conference on Composite Construction, Henniker, NH, USA, June.