Transfer length of 2400 MPa seven-wire 15.2 mm steel strands in high-strength pretensioned prestressed concrete beam
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
  • Journal title : Smart Structures and Systems
  • Volume 17, Issue 4,  2016, pp.577-591
  • Publisher : Techno-Press
  • DOI : 10.12989/sss.2016.17.4.577
 Title & Authors
Transfer length of 2400 MPa seven-wire 15.2 mm steel strands in high-strength pretensioned prestressed concrete beam
Yang, Jun-Mo; Yim, Hong-Jae; Kim, Jin-Kook;
 Abstract
In this study, the transfer length of 2400 MPa, seven-wire high-strength steel strands with a 15.2 mm diameter in pretensioned prestressed concrete (PSC) beams utilizing high strength concrete over 58 MPa at prestress release was evaluated experimentally. 32 specimens, which have the variables of concrete compressive strength, concrete cover depth, and the number of PS strands, were fabricated and corresponding transfer lengths were measured. The strands were released gradually by slowly reducing the pressure in the hydraulic stressing rams. The measured results of transfer length showed that the transfer length decreased as the concrete compressive strength and concrete cover depth increased. The number of strands had a very small effect, and the effect varied with both the concrete cover depth and concrete strength. The results were compared to current design codes and transfer lengths predicted by other researchers. The comparison results showed that the current transfer length prediction models in design codes may be conservatively used for 2400 MPa high-strength strands in high-strength concrete beams exceeding 58 MPa at prestress release.
 Keywords
high-strength concrete;2400 MPa prestressing strand;prestressed concrete;pretension;transfer length;
 Language
English
 Cited by
 References
1.
ACI Committee 318 (2008), Building code requirements for structural concrete (ACI 318-08) and commentary, American Concrete Institute, Farmington Hills, MI.

2.
Balazs, G. (1992), "Transfer control of prestressing strands", PCI J., 37(6), 60-71. crossref(new window)

3.
Briere, V., Harries, K.A., Kasanc, J. and Hagerd, C. (2013), "Dilation behavior of seven-wire prestressing strand-The Hoyer effect", Constr. Build. Mater., 40, 650-658. crossref(new window)

4.
CEN (2004), EN 1992-1-2 Eurocode 2: Design of concrete structures. Part 1-2: General rules-structural fire design Comite Europeen de Normalisation, Brussels, Belgium.

5.
Cousins, T., Johnston, D. and Zia, P. (1990), "Transfer and development length of epoxy-coated and uncoated prestressing strand", PCI J., 35(4), 92-103. crossref(new window)

6.
Hanson, N.W. (1969), "Influence of surface roughness of prestressing strand in bond performance", PCI J., 14(1), 32-45

7.
Kaar, P.H. and Hanson, N.W. (1975), "Bond fatigue tests of beams simulating pretensioned concrete crossties", PCI J., 20(5), 65-80. crossref(new window)

8.
Kim, J.K., Seong, T.R., Jang, K.P. and Kwon, S.H. (2013), "Tensile behavior of new 2,200 MPa and 2,400 MPa strands according to various types of mono anchorage", Struct. Eng. Mech., 47(3), 383-399. crossref(new window)

9.
KS D7002 (2011), Uncoated stress-relieved steel wires and strands for prestressed concrete, Korean Standards Association, Seoul, Korea.

10.
Marti-Vargas, J.R., Arbelaez, C.A., Serna, P., Navarro-Gregori, J. and Pallares-Rubio, L. (2007), "Anlaytical model for transfer length prediction of 13 mm prestressing strand", Struct. Eng. Mech., 26(2), 211-229. crossref(new window)

11.
Mitchell, D., Cook, W.D., Khan, A.A. and Tham, T. (1993), "Influence of high strength concrete on transfer and development length of pretensioning strand", PCI J., 38(3), 52-66.

12.
Oh, B.H., Lim, S.N., Lee, M.K. and Yoo, S.W. (2014), "Analysis and prediction of transfer length in pretensioned, prestressed concrete members", ACI Struct. J., 111(3), 549-560.

13.
Pozolo, A.M. and Andrawes, B. (2011), "Transfer length in prestressed self-consolidating concrete box and I-girders", ACI Struct. J., 108(3), 341-349.

14.
Russell, B.W. and Burns, N.H. (1997). "Measurement of transfer lengths on pretensioned concrete elements", J. Struct. Eng.-ASCE, 123(5), 541-549. crossref(new window)

15.
Yim, H.J., Kim, J.K. and Yang, J.M. (2015), "Experimental study on the transfer length in pretensioned prestressed concrete beam using 2,400 MPa PS strand", J. Korean Soc. Hazard Mitig., 15(2), 41-49. crossref(new window)

16.
Zi, G., Rabczuk, T. and Wall, W. (2007), "Extended meshfree methods without branch enrichment for cohesive cracks", Comput. Mech., 40(2), 367-382. crossref(new window)

17.
Zia, P. and Mostafa, T. (1977), "Development length of prestressing strands", PCI J., 22(5), 54-65. crossref(new window)