JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Determination of Optimal Hourly Water Intake Amount for H Arisu Purification Center using Linear Programming
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Determination of Optimal Hourly Water Intake Amount for H Arisu Purification Center using Linear Programming
Lee, Chulsoo; Lee, Kangwon;
  PDF(new window)
 Abstract
Currently, the H purification plant determines the hourly water intake amount based on operator experience and skill. Therefore, inevitably, there are deviations among operators. While meeting time-varying demand and maintaining the proper water level in the clean water reservoir, the methodology for minimizing electricity cost, when dealing with different electricity rate time zones, is a very complicated problem, which is beyond an operator`s capability. To solve this problem, a linear programming (LP) model is proposed, which can determine the optimal hourly water intake amount for minimizing the daily electricity cost. It is shown that an inaccurate estimate for the hourly water usage in the demand areas causes the water level constraint to be violated, which is the weak point of the proposed LP method. However, several examples with real-field data show that we can practically and safely solve this problem with safety margins. It is also shown that the safety margin method still works effectively whether the estimate is accurate or not. The operators need not attend the site at all times under the proposed LP method, and we can additionally expect reductions in labor costs.
 Keywords
water purification plant;water intake station;linear programming;demand forecast;
 Language
English
 Cited by
 References
1.
(http://arisu.seoul.go.kr/arisu_center/center1/sub1_3.jsp).

2.
(http:/cyber.kepco.co.kr/ckepco/front/jsp/CY/E/E/CYE EHP00103.jsp).

3.
Agresti, A. (1996). "An Introduction to categorical data analysis. (1st ed.)." Florida : JohnWiley&Sons, (Chapter 4).

4.
Box, G.E.P., and Draper, N.R. (1998). "Evolutionary operation: a statistical method for process improvement. (2nd ed.)." WILEY, (Chapter 2).

5.
Ferreira, A.R., and Teegavarapu, R.S.V. (2012). "Optimal and adaptive operation of a hydropower system with unit commitment and water quality constraint." Water Resources Management, Vol. 26, No. 3, pp. 707-732. crossref(new window)

6.
H Arisu Purification Center (2015). "Major operational plan."

7.
H Arisu Purification Center 1) (2013.9-2014.4). "Daily electrical power report."

8.
H Arisu Purification Center 2) (2013.9-2014.4). "Daily flow report."

9.
H Arisu Purification Center 3) (2013.9-2014.4). "Daily water level report."

10.
Han, Y., Huang, Y., Jia, S., and Liu, J. (2013). "An interval parameter fuzzy linear programming with stochastic vertices model for water resource management under uncertainty." Mathematical Problems in Engineering, Vol. 2013, Article ID 942343, 12 pages.

11.
Heydari, M., Othman, F., and Quaderi, K. (2015). "Introduction to linear programming as a popular tool in optimal reservoir operation, a review." Advances in Engineering Biology, Vol. 9, No. 3, pp. 906-917.

12.
Heydari, M., Othman, F., Quaderi, K., nori, M., and Shahirparsa, A. (2015). "Developing optimal reservoir operation for multiple and multipurpose reservoirs using mathematical programming." Mathematical Problems in Engineering, Vol. 2015, Article ID 435752, 11 pages.

13.
Jung, J.K., and Lee, K.W.(2014). "Study on the optimal design of microgrid system using linear programming." Journal of the Korea Management Engineers Society, Vol. 19, No. 4, pp. 59-74.

14.
KEPCO (2015). "Electricity Rate Table."

15.
Mena, J.A. (2012). "The optimal organization structure design problem in make-to-order enterprises." International Journal of Industrial Engineering, Vol. 19, No. 4, pp. 181-192.

16.
Morais, H., Kadar, P., Faria, P., Vale, A., and Khodr. H. (2010). "Optimal scheduling of a renewable microgrid in an isolated load area using mixed-integer linear programming." Renewable Energy, Vol. 35, No. 1, pp. 151-156. crossref(new window)

17.
Tseng, T.L., Rosales, C.L., and Kwon, Y.J. (2014). "Optimization of wind turbine placement layout on non-flat terrains." International Journal of Industrial Engineering, Vol. 21, No. 6, pp. 384-395.

18.
Zhao, T., and Zhao, J. (2014). "Optimization operation of water supply reservoir: the role of constraints." Mathematical Problems in Engineering, Vol. 2014, Article ID 853186, 15pages.