JOURNAL BROWSE
Search
Advanced SearchSearch Tips
Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method
facebook(new window)  Pirnt(new window) E-mail(new window) Excel Download
 Title & Authors
Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method
Park, Seong-Sik; Lee, Sung-Bok; Shin, Sang-Hoon;
  PDF(new window)
 Abstract
This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage(). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.
 Keywords
Rental multi-family housing;Demolition construction cost;Predetermined amount;Cost accounting system;
 Language
Korean
 Cited by
 References
1.
국토해양부(2010), 보금자리주택 업무처리지침.

2.
기획재정부(2010), 예정가격 작성기준(예규, 2200.04-160-8).

3.
대한주택공사(2008), 2008 견적기준 감독실무.

4.
한국건설기술연구원(2010), 건설공사 표준품셈.

5.
김효진, 이철규(1999), 발파해체공사의 품 기준 설정 연구, 대한주택공사.

6.
김효진, 박성식, 신재완(2000), 해체공사의 설계 및 견적기준 정립 연구, 대한주택공사 .

7.
김효진, 박성식, 김종환(2005), 공동주택 철거잔재의 활용성 향상을 위한 해체공사 시스템 개발, 한국건설교통기술평가원.

8.
한국건설자원협회(2008), 건설폐기물의 적정처리・재활용 촉진을 위한 업무처리 요령.

9.
한국환경정책평가연구원(2004), 건설폐기물 분리배출 및 발생원단위 산정 등에 관한 연구.

10.
조태완(2004), "해체공사비 비교분석을 통한 발파해체 공법 전망" 한국건설관리학회 논문집, 5(4): 130-138.

11.
김창학(2011), "해체폐기량 산정 및 통합관리를 위한 시스템 개발" 한국건설관리학회 논문집, 12(1): 133-140.

12.
홍원화, 손병훈, 정응혁, 정종석(2007) "주거용 건축물 해체 전.후의 건설폐기물 발생량 비교 . 분석을 통한 건설폐기물 발생원 단위 작성 연구" 대한건축학회논문집, 23(10): 169∼170.

13.
유일현(2005), "건설공사의 표준품셈과 실적공사비 원가계산 방법의 비교연구" 충남대학교 회계논집, 6(1).

14.
김찬규, 강윤식, 권석원(2006), "건설공사 원가산정의 표준품셈과 실적공사비 비교 연구" 한국건설관리학회 학술발표대회 논문집, 82-85.

15.
한승현, 곽수남, 김두연, 김병일, 최석진(2009), "가용정보를 활용한 기획 및 설계초기 단계의 도로공사비 예측모델" 한국건설관리학회 논문집, 10(4): 87-100.