Proceedings of the Korean Society of Precision Engineering Conference (한국정밀공학회:학술대회논문집)
Korean Society for Precision Engineering (한국정밀공학회)Abstract
This study was aimed to verify the acceptable contact force between power collector and 3rd rail type conductor rail for the Korean standardized rubber-tired AGT light rail vehicle. The power collector was designed and manufactured to satisfy the Korean standardized Specifications of the rubber-tired AGT light rail vehicle. Based on the dynamic behavior, contact force variation and interruption in the worst installation tolerance of the conductor rail, its initial contact force was set up. At the test track for the Korean standardized rubber-tired AGT light rail vehicle, interruptions, stresses, vibrations, and contact force variations were measured. As the results, initial contact force was verified to ensure power collection stability.