Abstract
This study is examination of application on site for performance and stability of real-time broken rail detection equipment development system about connection, welded part occurring data errors of broken rail monitoring system. As a result of analysis about data collected in Seoul Metro No.2 Subway from Mar. 2010 to Jan. 2011, we found it is possible to detect crack location(Thermit welding) within the margin of error of
Keywords