The $Mer{\aa}ker$ TBM Project in Norway

노르웨이 메로케르 수력발전소의 TBM 굴착

  • 박연준 (수원대학교 토목공학과) ;
  • 박철환 (한국지질자원연구원 지반안전연구부)
  • Published : 2005.02.01

Abstract

This paper presents an article explaining a TBM project overall in Norway. The paper which published in Norwegian TBM Tunnelling by Norwegian Soil and Rock Eng. Assoc. in 1998, contains most of the items considered in TBM tunnelling. New powerplants, tunnels and dams have been built at Meraker in Central Norway. A total of 44 km of tunnels with cross sections varying from $7\;m^2\;to\;32\;m^2$ have been excavated in hard rock formation. Tunnel of 10 km with the 3.5 m diameter was excavated by a HP TBM in a year. his project gives the special attention to the TBM drive and equipment selection, including planning, site organization and performance.

Keywords

norwegian tunnelling;HP TBM;TBM drive;IBM performance

References

  1. Johannessen, S. and O. Askilsrud, 1993, Mer!lker HydroTunnelling the Norwegian way, Proc. RETe 1993
  2. NTNU, 1988, Project Report 1-88, Hard rock tunnel boring, NTNU
  3. NTNU, 1994, Project Report 1-94, Hard rock tunnel boring, NTNU