Abstract

In the nuclear power plant, early detection of fatigue crack by non-destructive test (NDT) equipment due to the thermal cyclic load is very important in terms of strict safety regulation. To this end, many efforts are exerted to the fabrication of artificial cracked specimen for practicing engineers in the NDT company. The crack of this kind, however, cannot be made by conventional machining, but should be made under thermal cyclic load that is close to the in-situ condition, which takes tremendous time due to the repetition. In this study, thermal loading condition is investigated to minimize the time for fabricating the cracked specimen using simulation technique which predicts the crack initiation and propagation behavior. Simulation and experiment are conducted under an initial assumed condition for validation purpose. A number of simulations are conducted next under a variety of heating and cooling conditions, from which the best solution to achieve minimum time for crack with wanted size is found. In the simulation, general purpose software ANSYS is used for the stress analysis, MATLAB is used to compute crack initiation life, and ZENCRACK, which is special purpose software for crack growth prediction, is used to compute crack propagation life. As a result of the study, the time for the crack to reach the size of 1mm is predicted from the 418 hours at the initial condition to the 319 hours at the optimum condition, which is about 24% reduction.

References

  1. Irwin, G.R. (1957) Analysis of Stresses and Strains near the End of a Crack Traversing a Plate, J. Appl. Mech., 24, pp.361-364
  2. Lee, B.Y., Jin, H.K., An, D.H., Ryu, D.H., Kim, J.S., Lee, J.H. (2006) Study on the Control and Fabrication of Thermal Fatigue Crack for Reliability Enhancement of NDT in Reactor Coolant System, Engineering Materials, Vols. 321-323, pp. 739-742
  3. Stephens, R.I. (2001) Metal Fatigue in Engineering, A Wiley-Interscience Publication, New York, p.471
  4. Choi, J.H., Lee, G.B., Lee, B.Y. (2006) A Study on the Thermo mechanical Fatigue Loading for Attaining Minimum Cycles in Fabrication an Artificial Cracked Specimen, The Fourth China-Japan-Korea Joint Symposium on Optimization of Structural and Mechanical Systems, Kunming, Nov. 6-9, 2006, China, pp.575-580
  5. Kemppainen, M., Virkkunen, I., Pitkanen, J., Paussu, R., Hanninen, H.(2003) Advanced flaw production method for in-service inspection qualification mock-ups, Nuclear Engineering and Design, 224, pp.105-117 https://doi.org/10.1016/S0029-5493(03)00078-5
  6. Dowling, N.E. (1999) Mechanical Behavior of Materials, Prentice Hall, Inc., New Jersey, p.830
  7. 홍재근, 송상우, 박반욱 (2002) 초음파 탐상 실증을 위한 피로 결함 시험편 제조법 기계와 재료, 14(3), pp.85-86
  8. Rothman, M.F. (1988) High-Temperature Property Data: FERROUS ALLOYS, ASM international
  9. ZENCRACK Manual, (2005) Zentech International Ltd