DOI QR코드

DOI QR Code

Current Status and Improvement Plan for Foreign Construction Laborer

외국인 건설 근로자 현황 및 개선방안

  • 박희성 (한밭대학교 건설환경공학과)
  • Received : 2015.07.20
  • Accepted : 2015.09.02
  • Published : 2015.09.28

Abstract

The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

Keywords

Construction Industry;Technician;Project Management;Labor Management

Acknowledgement

Supported by : 한밭대학교

References

  1. L. T. Richard, Carl T. Haas, W. G. Robert, A. Christine, A. C. Lynn, M. R. Ana, and S. David Key Workforce Challenges Facing The American Construction Industry: An Interim Assessment, Center for Construction Industry Studies, 1999.
  2. Carl T. Haas, L. T. Richard, W. G. Robert, and E. Derek, Distribution of Craft Management Skills in A Tier II Work Team, Center for Construction Industry Studies, 2002.
  3. John D. Borcherding, W. G. Robert, Carl T. Haas, and L. T. Richard, Metric-Based Implementation of Tier II Work Force Strategy, Center for Construction Industry Studies, 2001.
  4. Carl T. Haas, T. O. James, L. T. Richard, A. E. Jason, and R. F. Walter, Prefabrication And Preassembly Trends And Effects On The Construction Workforce, Center for Construction Industry Studies, 2000.
  5. 손창백, 건설근로자의 동기부여를 통한 가동율 증진방안에 관한 연구, 중앙대학교, 박사학위논문, 1992.
  6. 손창백, 홍송호, 이동은, "건설경기변화의 건설근로자 가동율 및 생산성에 대한 영향분석", 대한건축학회논문집 (구조계), 제26권, 제5호, pp.141-149, 2010.
  7. 손창백, 박찬식, "건설경기변화에 따른 생산직 건설근로자의 가동율 및 생산성 비교.분석-아파트 건설현장을 중심으로-", 대한건축학회논문집 (구조계), 제17권, 제7호, pp.101-108, 2001.
  8. 박명수, 건설업 직업훈련제도의 문제점과 개선방안, 한국건설산업연구원, 1995.
  9. 한국건설산업연구원, 건설기능인력 육성방안, 2001.
  10. 손창백, 이동은, "건설경기변화의 건설근로자 욕구수준 및 직업만족도에 대한 영향분석", 대한건축학회논문집 (구조계), 제26권 제7호, pp.155-162, 2010.
  11. 손창백, "남성 및 여성 생산직 건설근로자의 근로환경 및 의식동향 비교분석", 한국건축학회논문집 (구조계), 제22권, 제4호, pp.169-176, 2006.
  12. 손창백, "국내 건설현장의 외국인근로자 고용실태 분석", 대한건축학회논문집, 제21권, 제6호, pp.115-112, 2005
  13. 노동부, 저숙련 외국인근로자 도입에 따른 고용 실태 분석 및 고용관리체계 연구, 2005.
  14. 오치돈, 손창백, "건설근로자의 직업교육훈련 제도 및 운영실태 분석", 한국건설관리학회 학술발표대회논문집, pp.61-264, 2004.
  15. 오치돈, 박찬식, "고용허가제 도입에 따른 외국인 근로자의 고용실태분석 및 개선방안", 한국건설관리학회 논문집, 제11권, 제2호, pp.83-94, 2010.