A Economic Evaluation for APR+ Standard Design

APR+ 표준설계에 대한 경제성 분석

  • Received : 2015.10.28
  • Accepted : 2015.12.10
  • Published : 2016.03.31

Abstract

KHNP CRI has developed APR+ nuclear power plant since 2007, which is GEN III+ model with 1500 MWe capacity. To develop safer nuclear power plant than APR1400, we investigated advanced design features of ALWR being constructed in Korea and being developed/constructed in foreign countries. We applied the advanced design features and lessons learned from Fukushima accident to develop APR+ standard design suitable for both domestic construction and overseas construction business. One economic assessments have performed during safety design improvement phase(2013.1 ~ 2015.12) of APR+. The result of the economic analysis for APR+ safety inhancement design showed that APR+ N-th plant is about 39.2% more economical than coal-fired 1,000MW power plant. Also APR+ plant is more cost advantage over foreign advanced nation ALWRs.

Keywords

APR+;Capital Cost;O&M cost;Fuel Cost;Economic Evaluation

References

  1. EPRI, Technical Assessment Guide, Volume 1, Rev.7, 1993
  2. EPRI, Technical Assessment Guide, Volume 3, Rev.7, 1997
  3. EPRI, ALWR Cost Estimating Groudrules, 1995
  4. KHNP CRI, Cost Estimate Report for APR+ Standard Design Development Phase III, Oct. 2015
  5. Ministry of Knowledge Economy, 5th Electricity Supply Plan, Dec. 2010
  6. Ministry of Industry Trade, 5th Electricity Supply Plan, Feb. 2013
  7. KEPCO, Final Cost Estimate Report for KNGR Development Phase II, Feb. 1999
  8. Notice 2013-63 of Ministry of Industry Trade, June 2013