Recently, the demand for liquefied gas has been increasing for various reasons, including environmental problems, and as a result, transportation of liquefied gas through a ship is increasing, and several terminals are also being constructed to accommodate it. The size of the terminal to be constructed shall follow the result if the target ship is clearly determined. Otherwise, the size of the vessel that the terminal intends to accept shall be determined, and then, the dimensions of the vessel given in the regulations or standards shall be used. In this regard, it was found that the main dimensions of the proposed vessels are substantially different from those actually operating and the standard for large-sized vessels has not been established in the process of determining the size of the target vessel by using the "Port and Fishing Port Design Standards" and commentary(2017), which recently is most commonly used as port design criteria in order to construct the liquefied gas terminal. Because of these problems, a revision of the standard for the major dimensions of liquefied gas carriers was proposed through an analysis of the current status of ships in service, as there could be many differences between interested parties in determining the size of the target ships and terminals and evaluating the safety of terminals. It is expected that the proposed revision will be used as a more appropriate and realistic criterion for determining the size of ships and terminals in the future and will prevent unnecessary terminal construction costs.