무연탄 수요예측 및 공장규모 결정에 관한 사례연구

  • 발행 : 1990.04.01

초록

All most factories producing briquets in Seoul are currently located at residential districts. The coal dusts scattered from these factories are making serious problems in living. To get rid of this environmental pollution, moving thesis factories to places of mining coals is considered now. For doing this project, first, annual briquet demands are forecasted using regression analysis and then, optimal factory capacities to be built are obtained based on forecast demands using LP. To validate factory capacities obtained above simulation is conducted using SLAM II.

키워드