A study on the ice and snow loading condition in Taebaek and Sabuk area in Gangwon province for the construction of KEPCO 765kV transmission lines

한전 765 kV 송전선로 건설을 위한 강원도 태백.사북지역 착빙설 하중조건 검토

  • Park, K.H. (UHV Project office, T/S Construction Dept., KEPCO) ;
  • Kim, Y.W. (UHV Project office, T/S Construction Dept., KEPCO) ;
  • Won, B.J. (UHV Project office, T/S Construction Dept., KEPCO)
  • 박광희 (한국전력공사 송변전건설처 송전전압격상추진반) ;
  • 김용완 (한국전력공사 송변전건설처 송전전압격상추진반) ;
  • 원봉주 (한국전력공사 송변전건설처 송전전압격상추진반)
  • Published : 1996.07.22

Abstract

Some part of the route in KEPCO 765kV transmission line being constructed passes through a high mountain area which is 800m above the sea level (Taebaek, Sabuk area in Gangwon province). This area is the top part of Taebaek mountains corresponding to the backbone of korean peninsula and has lots of snow during the winter season because the winter seasonal wind gone up along the mountainside of Taebaek Mts. meets open air of the East sea. KEPCO has experienced 63 faults of T/L between 1968 and 1993 in this area, which is a very serious problem. Especially 154kV Hwang-Ji T/L fault in 1990, 2 was a unprecedented case which needs to be analyzed carefully to take proper measures. After reviewing ice and snow loading conditions and analyzing the fault of Hwang-Ji T/L, we're going to determine the revisement of ice and snow loading condition in this area to increase reliability of 765kV transmission line.