엔진 블록 가공라인의 물류분석

Performance Analysis of the Block Production Line in an Engine Production Plant

  • 김상훈 (고등기술연구원 생산기술연구실)
  • 발행 : 1999.04.01

초록

Tool shop of the D Heavy Industries Co.(DHI) fabricates engines for a bus, truck, small ship. In order to increase the production capacity of engines, DHI will be established the new tool shop that consists of a block line, head line, assembly line, test line and AS/RS in 1999. In order to assure the production capacity designed of the new tool shop for producing engines and improve the production process of it, it is needed to find a bottleneck process and an optimal way of allocating workloads among machines and workers to maximize the production. In a way to solve this, we model the engine fabrication process of the tool shop and analyze its performance by computer simulation. In this study, we at first identify the bottleneck processes of the engine fabrication process under the designed operation policy. Then, we derive some alternative operating policies applicable to the new tool shop of an engine, and analyze the optimal operation policy by comparing the performance of the tool shop following each alternative policy.

키워드