정유공장 전력계통 동특성을 고려한 부하차단 적용 사례연구

Load shedding case study of the refinery plant power system considering dynamic characteristic

  • 발행 : 2000.07.17

초록

This paper presents the load shedding case studies and recommendations of load shedding scheme For improving the reliability to suit the requirements of LG-Caltex refinery plant power sγstem. It is recommended for LG-Caltex to decrease the total generation for the economic dispatch. When the LG-Caltex refinery is isolated from KEPCO utility system, the proper load shedding scheme should be implemented since total generation in LG-Caltex refinery plant is less than the load demand. According to the studies carried out the logic-based load shedding is recommended as the main protection scheme, with the combination of the under-frequency relay load shedding.

키워드