The detail survey on the Songsanri tomb site including the Muryong royal tomb was carried out during the period from May 1 , 1996 to April 30, 1997. A quantitative analysis was tried to find changes of tomb itself since the excavation. Main subjects of the survey are to find out the cause of infiltration of rain water and groundwater into the tomb and the tomb site, monitoring of the movement of tomb structure and safety, removal method of the algae inside the tomb, and air controlling system to solve high humidity condition and dew inside the tomb. For these purposes, detail survery inside and outside the tombs using a electronic distance meter and small airplane, monitoring of temperature and humidity, geophysical exploration including electrical resistivity, geomagnetic, gravity and georadar methods, drilling, measurement of physical and chemical properties of drill core and measurement of groundwater permeability were conducted. We found that the center of the subsurface tomb and the center of soil mound on ground are different 4.5 meter and 5 meter for the 5th tomb and 7th tomb, respectively. The fact has caused unequal stress on the tomb structure. In the 7th tomb (the Muryong royal tomb), 435 bricks were broken out of 6025 bricks in 1972, but 1072 bricks are broken in 1996. The break rate has been increased about 250% for just 24 years. The break rate increased about 290% in the 6th tomb. The situation in 1996 is the result for just 24 years while the situation in 1972 was the result for about 1450 years. Status of breaking of bircks represents that a severe problem is undergoing. The eastern wall of the Muryong royal tomb is moving toward inside the tomb with the rate of 2.95 mm/myr in rainy season and 1.52 mm/myr in dry season. The frontal wall shows biggest movement in the 7th tomb having a rate of 2.05 mm/myr toward the passage way. The 6th tomb shows biggest movement among the three tombs having the rate of 7.44mm/myr and 3.61mm/myr toward east for the high break rate of bricks in the 6th tomb. Georadar section of the shallow soil layer represents several faults in the top soil layer of the 5th tomb and 7th tomb. Raninwater flew through faults tnto the tomb and nearby ground and high water content in nearby ground resulted in low resistance and high humidity inside tombs. High humidity inside tomb made a good condition for algae living with high temperature and moderate light source. The 6th tomb is most severe situation and the 7th tomb is the second in terms of algae living. Artificial change of the tomb environment since the excavation, infiltration of rain water and groundwater into the tombsite and bad drainage system had resulted in dangerous status for the tomb structure. Main cause for many problems including breaking of bricks, movement of tomb walls and algae living is infiltration of rainwater and groundwater into the tomb site. Therefore, protection of the tomb site from high water content should be carried out at first. Waterproofing method includes a cover system over the tomvsith using geotextile, clay layer and geomembrane and a deep trench which is 2 meter down to the base of the 5th tomb at the north of the tomv site. Decrease and balancing of soil weight above the tomb are also needed for the sfety of tomb structures. For the algae living inside tombs, we recommend to spray K101 which developed in this study on the surface of wall and then, exposure to ultraviolet light sources for 24 hours. Air controlling system should be changed to a constant temperature and humidity system for the 6th tomb and the 7th tomb. It seems to much better to place the system at frontal room and to ciculate cold air inside tombs to solve dew problem. Above mentioned preservation methods are suggested to give least changes to tomb site and to solve the most fundmental problems. Repairing should be planned in order and some special cares are needed for the safety of tombs in reparing work. Finally, a monitoring system measuring tilting of tomb walls, water content, groundwater level, temperature and humidity is required to monitor and to evaluate the repairing work.

무령왕릉의 보존대책을 수립하기 위하여 누수 현상, 고분구조 벽체거동 상황 및 구조안전점검, 고분 내에 서식하는 조류의 제거, 고분내 습기 및 결로현상 제거를 위한 공기조화시설 등을 포함하는 종합 정밀저사를 1996년 5월 1일 부터 1997년 4월 30일 까지 1년간 수행하였다. 이러한 연구를 수행하기 위하여 기초 지반에 대한 정밀측량, 고분 내외부의 년중 온습도 모니터링, 지반의 내부물성 파악을 위한 지구물리 탐사, 시추 자료에 대한 각종 물성실험, 지반의 투수계수 측정 및 지구화학적 분석을 실시하였다. 고분 내외부에 대한 정밀측량 결과 봉분 중심의 현실 중심보다 북동쪽으로 5m 이격되어 있다. 무령왕릉의 경우는 발굴 당시에도 유사한 분포를 하였으나, 이로 인하여 불균형적인 토압을 발생시키는 원인이 되고 있다. 벽돌깨짐 상황 조사결과 무령왕릉의 조사 대상 벽돌 6025장중 1972년에는 435장 파손되었던 것이 1996년 조사결과 1072장이 파손된 것으로 밝혀져 파손율이 2.5배로 증가하였다. 6호분의 경우는 이보다 더 심하여 벽돌 파손율이 2.9배로 증가하고 있다. 1972년 상황은 약 1450년간 진행된 것이고 1996년의 상황은 불과 24년간 진행된 것임을 감안할 고분이 발굴된 이후 벽돌의 균열은 상당한 가속도로 진행되어 온것이 사실이며 이대로 진행된다면 더욱 더 가속화될 것으로 판단된다. 고분벽체의 거동상태를 계측한 결과 무령왕릉 동측벽의 경우 우기와 건기에 각각 2.95 mm/myr및 1.52 mm/myr의 거동을 보여 우기에 지하수 유입에 의한 지반의 약화로 인하여 건기보다 2배정도 거동하는 양상을 보인다. 한편, 연도 입구의 호벽은 건기에 전실쪽으로 0.43 mm/myr, 연도쪽으로 2.05 mm/myr의 거동을 보여 무령왕릉에서는 가장 심한 거동을 보이고 있다. 6호분의 거동현황은 건기에만 측정된 바, 현실의 동측벽과 서측벽이 각각 벽체 뒤쪽으로 7.44 mm/myr, 현실안쪽으로 3.61 mm/myr의 거동을 보여 조사대상 5호분, 6호분, 7호분, 중 가장 심한 거동을 보이고 있다. 이는 고분 벽돌의 깨짐이 6호분이 가장 심하다는 사실과 무관하지 않은 것으로 판단된다. 봉분내부의 토양층구조에 대한 지오레이다 영상단면을 분석한 결과 무령왕릉 연도상부의 누수지방지층이 심하게 균열되어 있음을 발견하였다. 이 곳은 고분내부로 직접누수가 발생하는 곳이다. 직접누수와 지하수 형태로 유입된 침투수는 고분군 주위의 지반의 함수비를 증가시켜 지반의 지지력을 약화시키고 또한 고분내로 서서히 유입되어 고분내부의 습도를 100%로 유지시키는 주된 원인이다. 이러한 높은 습도는 고분내의 남조류의 번식을 가져왔으며 남조류의 번식은 현재 6호분이 가장 심각하고 7호분이 우려되는 수준이며 5호분은 문제가 없는 것으로 판단된다. 이와 같이 고분군의 발굴후 인위적인 환경변화와 지속적인 강우침투 및 배수 불량의 영향은 고분군의 안정성에 상당한 위험을 초래하였으며, 현 상태는 각 고분에 대한 보강이 불가피한 것으로 판단된다. 고분 벽돌의 깨짐, 고분 벽체의 거동, 조류의 서식등을 포함하여 송산리 고분군에서 발생되고 있는 보존상의 제반 문제점들을 일차적으로 누수 및 침투수에 의한 결과이다. 그러므로 무엇보다도 고분군 내부 및 고분 주변으로의 강우 및 지하수 침투를 막는 차수 대책이 시급한 것으로 판단된다. 또한 이미 발생한 변위가 더 이상 진행되지 않도록 하중을 경감하고 토압의 균형을 이루는 보강대책이 시급한 실정이다. 고분군의 보존대책으로는 고분의 구조안전에 관하여 근본적인 구조변경이 불가피한 직접 보강대책보다 간접적인 보강대책이 바람직한 것으로 판단된다. 간접적 보강대책으로서는 현 봉분규모의 축소, 불균등토압의 조정, 강우침투 방지를 위한 최종복토시스템, 유도배수구의 설치 및 능선 상부로부터의 지하수 차단시설을 포함한다. 이러한 차수대책은 고분군의 제문제를 해결하는 가장 근본적인 대책이라 할 수 있다. 고분내 결로현상 및 습기 제거를 위하여 항온항습장치를 전실에 설치하고 덕트를 통하여 고분내 현실로 순환시키는 방법을 제안하며 외부 온도의 영향을 덜 받게 하기 위하여 전실상부 토양을 현재보다 두껍게 하고 전실의 천정마감재를 열전도도가 낮은 목재로 교체하며 출입문의 이동등을 제안하였다. 금번 조사 연구를 통하여 얻어진 각종 보수 및 보존대책은 고분구조 자체에 가능한 한 최소의 변화를 주면서 가장 시급한 문제점부터 해결하도록 제시되었다. 설계 및 시공단계에서는 보수의 경중을 가려 순서에 입각하여 이루어져야만 하며 설계 및 시공단계에서 고분의 구조안전에 영향을 주지 않도록 각별한 주의가 요망된다. 끝으로, 상기의 보수대책이 실시된 후 이에 대한 평가 및 향후의 영구 보존을 위한 벽체경사 계측, 함수비 및 지하수위 계측, 온습도 측정 등을 포함하는 사후계측시스템은 필수적이라 할 수 있다. 각종 계측자료를 이용한 장기적이고도 세심한 분석을 통하여 완벽한 보존 관리가 이루어져야할 것으로 사료된다.로 사료된다.

Keywords