Full Scale Tests of Concrete Filled Steel Tube Column using High Fluidity Concrete

고유동 콘크리트를 이용한 콘크리트 충전강관 기둥의 실물대 시공실험

  • Published : 2001.11.01

Abstract

Full scale construction tests of CFT(concrete filled steel tube) column to solve construction problem and to confirm quality were performed in apartment site. To improve construction efficiency, the tests has been accomplished two stages after the tests for material mixing design had been completed. In the first stage, the experimental variables were the placing methods, existence of guiding pipe, placing velocity and drop height and the height of specimen were $3.6{\cal}m$. In the second stage, Filling steel tube of 9.6m height with concrete was performed by two ways, that is, the pump-up method and the dropping method. The filled condition of the concrete and concrete strength distribution according to the column height were checked and the quality of the CFT column was confirmed.

고층 건축물에 사용할 CFT 기둥에 적합한 고유동 콘크리트를 개발하고, 이를 적용하여 실물대의 Mockup 실험을 진행하여 시공시 문제점 및 관리기술을 확보하고자 하였다. 사전에 재료선정실험을 진행하여 CFT 기둥에 가장 적합한 재료를 선정하고, 시공성을 향상시키기 위하여 2단계에 걸쳐 실험을 진행하였다. 1차 실험에서는 타설방법, 유도관의 유무, 타선속도, 낙하높이 등을 변수로 실험을 진행하여 그중 시공성이 우수하면서 품질관리에 문제가 없는 변수를 대상으로 2차 실험을 진행하였다 2차 실험에서는 $9.6{\cal}m$ 높이의 강관에 타설방법을 달리하여 콘크리트 충전실험을 진행하였다. 실험결과 시공성 향상을 위하여 기존의 시공지침과 차이를 가진 변수에서도 우수한 충전성능을 보임을 확인하였다.

Keywords