LOADOUT DEVELOPMENT BY F.E. ANALYSIS METHODOLOGY FOR SIMILAR 300K VLCC SIZE FSO

  • Yang, Y.T. (Hyundai Heavy Industries Co. Ltd Offshore Division) ;
  • Kang, H.S. (Hyundai Heavy Industries Co. Ltd. Offshore Division)
  • 발행 : 2002.10.25

초록

End of July. 2002 Hyundai Heavy Industries Co. Ltd. Offshore Division is successfully completed Load-out & Float-off work of "AMENAM KPONO/FSO Project" similar to 300K VLCC size. The AMENAM FSO hull and topside module built at the HHI Offshore yard using "On-Ground Building Method" developed by HHI. Various methodologies/techniques like Flexi-built FPSO Hull. Topside module erection method. Load-out Float-off methodology etc. are combined to develop a successful on-ground building method. In this paper, we described the "Hull Structural Strength Analysis Methodology" using 3-D Finite Element Analysis and results. This analysis is performed to verily the structural integrity or the AMENAM FSO hull during the main load-out on two semi-submersible barges combined together.

키워드