Datamodel for Productivity Management of Construction Project

건설공사 생산성 관리를 위한 데이터모델

  • Published : 2002.11.01

Abstract

Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

건설공사 클레임 중에서 공기지연 클레임의 발생빈도가 높다. 공기지연 클레임은 발주자와 원도급자 모두에게 프로젝트 자체의 경제적 문제 뿐 만 아니라 회사의 존폐와 관련이 된다. 체계적인 증빙자료의 부재로 인하여 산정방법이 정량적이지 못하기 때문에 공기지연 클레임을 공평하게 해결하는 데 어려움이 많다. 따라서, 건설공사 단계에서 공사정보 또는 증빙자료를 체계적으로 구축할 수 있어야 한다. 본 연구는 예비적 고찰로 공기지연 클레임 데이터베이스의 기존 연구와 문제점을 고찰하였다. 단계별 공정표와 데이터베이스 연계구축 방안을 제시하였고, 건설생산성 데이터베이스 구축을 위한 요구정보에 근거하여 개념적 데이터모델링과 논리적 데이터모델링을 통한 건설공사 생산성 관리를 위한 데이터 모델링을 구축하였다. 이에 본 연구는 손실생산성을 고려한 공기지연일수 산정을 위해 건설공사 생산성 관리를 위한 데이터모델의 구축을 목적으로 한다.

Keywords