장경간 청담대교에서 궤도의 변위와 구조불간의 상호작용에 관한 연구

A study on interaction of track displacement and structure on long span Cheongdam Bridge

  • 김순철 ((주)석탑엔지니어링 궤도부) ;
  • 박석순 (서울도시철도공사) ;
  • 이종득 ((주)석탑엔지니어링) ;
  • 강정옥 ((주)석탑엔지니어링 궤도부) ;
  • 한광섭 ((주)석탑엔지니어링 궤도부)
  • 발행 : 2003.10.01

초록

Cheongdam Bridge in Seoul Metropolitan Subway Line No.7 recently constructed has 180 meters (2@90m) of expansion length of structure (distance between fixed points). Track type is all ballasted track and rail expansion joint is installed at every movable point. However, there is no expansion joint at the transition area between ballasted track ,end deck. By this reason, the rail buckling has been occurred every year and there is actually an abnormal behavior in expansion. In this study, based on the modeling of the Cheongdam Bridge, the element of interacting relationship between track and structure which is influential to track displacement in long-span bridge was analyzed and, finally, the methodology to ensure the continuous-welded rail in Cheongdam Bridge was suggested.

키워드