Applied cases of advanced construction & engineering technology at Tower Palace III Project

타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례

  • Published : 2003.11.01

Abstract

Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

타워팰리스 III 현장은 현존하는 국내 건축물로는 가장 높은 초고층 주상복합건물이다. 초고층 현장에는 일반현장과는 다른 시공기술 및 엔지니어링 기술의 적용이 요구되는 바, 타워팰리스 III 현장은 지금까지 축적된 기술을 바탕으로 보다 발전된 시공기술과 엔지니어링 기술, 그리고 공정관리기법을 통하여 마감공사 포함 충 당 13.4일이라는 공사 속도를 달성하였다. 이와 같은 공사를 성공적으로 수행하기 위하여 적용된 첨단 시공기술로 1) 골조공사 및 외벽공사의 3-Day Cycle을 달성하기 위한 여러 가지 공법, 2) 초고층 주거건물의 마감공사 공정관리를 위한 Tact 공정관리 시스템, 3) 현장관리 시스템으로 물류관리 및 정보공유 시스템 등이 적용되었다. 또한 엔지니어링 요소기술로 1) 고유동 무다짐 콘크리트와 국내 최초의 압축강도 $800kgf/cm^{2}$의 초고강도 콘크리트 등의 New Material, 2) 냉각수 순환형 파이프쿨링 시스템 등의 New Method, 3) Smart Fan Control 주방환기 시스템을 포함한 Mechanical System 4) False Car System을 포함한 Electrical System 등이 있다.

Keywords