A Study on the Estimation of the Contingency by the Regression Analysis on the Apartment

회귀분석을 통한 공동주택 공사예비비 산정에 관한 연구

  • Published : 2003.11.01

Abstract

Construction manager must consider the possibility on the failure of the project in advance and the contingency to provide against the situation, those of which is a dangerous condition not to predict. If they have a quick decision without understanding the contingency, the over-cost in the total cost would be continuously accumulated, and be a barrier at a project going in progress. A various risk could not be coped with at a time to decide either going or sloping the project until the contingency is applied from the first step to progress the project. But a case to apply the contingency to the construction for the investment or the analysis of the project is a little. The process to evaluate it is also absent. The propose of this paper is the followed ; To establish the total cost including the risk first of all, devide into plus or minus factor of the cost, and then the process to calculate the contingency must be suggested by the regression analysis.

건설사업관리자는 사업을 진행하기 전에 사업의 실패 및 예측하지 못한 위험 발생 가능성에 대비한 공사예비비를 항상 고려해야 한다. 공사예비비를 충분히 이해하지 않고 판단을 내리게 되면 리스크로 인한 총공사비에서의 초과 비용이 누적되어 향후 사업진행에 지장을 줄 수도 있기 때문이다. 그러나 공사예비비를 사업초기부터 고려한다면, 그 사업의 실행 여부를 결정할 시점에서 여러 가지 리스크에 충분히 대비할 수 있다. 그럼에도 불구하고 국내 건설사업에서 실제로 공사예비비를 사업투자나 분석에 반영하고 있는 경우는 적으며, 공사예비비를 정당하게 평가할 수 있는 프로세스 역시 부재하다. 따라서 본 연구에서는 건설사업에서 리스크를 고려한 총공사비가 수립될 수 있도록 공사비 증감요인을 분류하고, 적정 공사예비비의 산정을 보장하기 위해 회귀분석을 통한 공사예비비 산정 프로세스를 제시한다.

Keywords