Impact of Work stopped on Site Productivity and Productivity Achievement Ratio

작업중단이 현장 생산성과 생산성달성율에 미치는 영향

  • Published : 2003.11.01

Abstract

This study takes a statistical approach to quantify tile impact of wort stopped on the following day's site productivity. Therefore, this study is aimed to verify this null hypothesis: 'A work stopped in a construction field does not impact on the following day's productivity and productivity achievement ratio'. For the purpose, work, stopped is presumed as a dummy variable impacting site productivity in multiple linear regression analysis. Moreover, the quantified impact of work slopped on productivity achievement ratio is identified based on this study. This study shows that construction managers should persevere in their efforts to secure the work continuity in order to improve site productivity and productivity achievement ratio.

작업중단이 다음날의 현장 생산성에 미치는 영향을 정량화하기 위해 본 연구는 통계적 방법을 제안한다. 따라서 본 연구는 다음 영가설을 검정하는 절차를 거쳤다. '건설현장에서의 작업중단은 다음날의 현장 생산성과 생산성달성율에 아무런 영향을 미치지 않는다'. 이를 검정하기 위해 본 연구는 작업중단을 생산성에 영향을 미치는 더미 변수로 가정하고, 사례 데이터를 바탕으로 회귀분석을 실시, 작업중단이 생산성에 미치는 영향을 정량화하였다. 또한, 이론 바탕으로 작업중단이 다음날의 생산성달성율에 미치는 영향을 검토하였다. 이러한 연구를 바탕으로, 현장에서 작업연속성을 확보하기 위한 노력이 생산성 확보 차원에서 유효함을 알 수 있었다.

Keywords