A Study on the Improving Life-up and Procurement Work Flow for Effectiveness of Resources increase in the Building Construction

건설공사의 자원 효용성 증대를 위한 조달 및 양중 작업흐름 개선에 관한 연구

  • 이형수 (경원대학교 대학원 건축학과) ;
  • 윤유상 (경원대학교 대학원 건축학과) ;
  • 서상욱 (경원대학교 건축학과)
  • Published : 2003.11.01

Abstract

The purpose of this study is to present an improved lift-up & procurement work flow for effectiveness of resources increase in building construction. The current lift-up & procurement work flow has some waste factors; complicated information system, connection lack with process and decision-making delay. Therefore the study applied the value stream mapping methodology for improvement of current lift-up & procurement work flow. The main contents of the study are as follows; 1) A problem of current work flow were analyzed through current state mapping(CSM). 2) An improved work flow was suggested through future state mapping(FSM). 3) An improvement effect analysis of information system and lift-up planning The study recommends that continuous improvement of lift-up & procurement work flow and efficient management of information in building construction.

최근 도심지 고층건축공사가 증가하면서 건설자원의 효율적인 관리가 중요시되고 있으나 현재 국내 건설현장에서 건설자재의 공급에 대한 많은 문제점을 가지고 있다. 공정과 연계되지 못한 자재의 조달 및 양중은 현장 내 재고 증가 및 작업지연을 유발하면, 복잡한 정보전달 체계는 관련 작업의 의사결정의 지연의 원인으로 작용하여 결과적으로 공사기간에 절대적인 영향을 미치고 있다. 따라서 공정진행을 고려한 조달 및 양중작업에서 각 공사담당자간의 효율적인 정좌전달 체계의 구축은 효과적인 공사수행을 위해 필수적이다. 본 연구에서는 사례조사를 통해 건설자재의 조달 및 양중작업의 문제점을 분석하여 가치흐름분석을 통해 구체적인 낭비요소를 추출한 뒤, 공사참여자간의 의사소통 체계를 구축 및 양중계획 업무흐름 개선방안을 제시하였다. 개선방안은 web을 기반으로 한 조달 및 양중시스템의 전반적인 체계로서 활용될 것이다.

Keywords