A Study on the Rolling Stock Scheduling considering maintenance activities in Railway

유지보수를 고려한 철도차량 운용계획에 관한 연구

  • Published : 2003.05.01

Abstract

The process of railway traffic planning is composed of several steps such as long-term, mid-term. short-term, and real-time plan. The planning of vehicle and manpower resources is a main research topic in tactical short-term planning step. Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far, power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high-speed railway is introduced, the operational planning of trainset vehicles become important, In this paper, we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

Keywords