A Study on the Application of Supply Chain Management in Curtain Wall Engineering

커튼월 공사에서의 공급사슬관리 적용에 관한 연구

  • Published : 2004.11.01

Abstract

The curtain wall engineering of local high-rise buildings consists of many phases such as design, curtain wail design, manufacture, procurement, construction and facility management, each of which also involves many' actors such as architect, curtain wall consultants, manufacturers, contractors, and facility managers. Moreover, the method for controlling the C/W process of each participant is needed. Eliminating wastes and problems existed in the C/W process can be more effective. What is more, it is necessary to improve the efficiency of the current process and to strengthen the competence through application of SCM to the C/W life-cycle. In addition, it is important that a ]ot of information transfer smoothly and share through information system. Therefore, this study aimed to propose the scope of application and the improvement directions in applying Supply Chain Management concept.

국내 초고층 건축물의 커튼월 공사는 건축설계, 커튼월 설계, 제작, 조달, 시공, 유지관리 단계를 거치는 전체 Life cycle의 각 단계별로 설계업체, 커튼월 설계 및 제조업체, 시공업체, 유지보수 업체 등 많은 참여주체들이 관여하는 공종으로 각 주체 간의 업무 프로세스를 효과적으로 관리하기 위한 방안이 요구되고 있다. 이에 따라 커튼월 공급망 전체를 최적화하여 진행 각 단계별로 존재하는 불확실성과 낭비요소를 제거하고, 공급망의 효율을 향상시키고 경쟁력을 강화하는 SCM개념의 적용이 필수적이라 할 수 있다. 또한, SCM 기법을 적용할 때 기업간 통합에 있어서 정보시스템과 정보의 관리는 여러 주체들이 하나의 네트워크를 이루어 정보시스템을 통하여 각 주체들의 많은 정보들이 원활하게 전달되고 공유되어야 하기 때문에 매우 중요하며 참여주체의 정보공유 및 교류가 가능한 통합된 정보시스템의 구축이 필수적이다.

Keywords