An Improved Scheme of Domestic Project Management Information System through Case Studies of Subway Construction in D. Area

국내 PMIS 사례분석을 통한 개선방안 - D지역 지하철 현장을 중심으로 -

  • Published : 2004.11.01

Abstract

Recently, by the growth of IT industry, the domestic construction is tried to spread with IT on the whole phases: 1)an, design, order, construction, and maintenance. On this, in the construction industry, is accelerated effort of the introduction of PMIS, it has various types of PMIS applied which is developed alone by large construction company and serviced with web-hosting by ASP corporation. In this study, through the analysis of PMIS which has applied on the subway construction in the D city, try to propose the improvement proposals and put out realistic problems. Therefore that analysis about needs of the order and operation of the phases, Domestic PMIS cases and International PMIS technique position have to consider and, the system is analyzed to needs of the order, design scheme, and utilization. On the basis of this result, the improvement proposals is proposed into the case of the contract, the system, the operation, the management and the contact of the external system.

국내 건설산업은 정보화산업의 급속한 성장으로 인해 산업 전반에 걸친 변화의 흐름에 맞추어 사업 전 단계(기획, 설계, 발주, 시공, 유지)에 걸쳐 IT를 접목하려는 노력이 확산되고 있다 현재 국내 건설산업에서 PMIS 구축 노력이 가속화 되고 있는 시점에서, 대형 건설업체의 독자적으로 개발된 형태와 일부 ASP 사업자의 웹호스팅 서비스를 통한 PMIS가 건설현장에 도입되어 적용되고 있다. 본 연구는 D지역에 건설 중인 지하철 정거장 건축공사에 적용되고 있는 PMIS의 발주자 요구사항 분석 및 운영단계에서의 현실적인 문제점과 개선방안을 제시하고자 한다. 이를 위해 국내의 PMIS 적용 사례 및 국외 PMIS 기술 현황에 대해 고찰하고 D지역 지하철 건축공사에 적용된 PMIS의 발주자 요구사항, 설계안, 활용도를 분석한다. 분석 결과를 바탕으로 PMIS 운영상의 문제점에 대한 개선 방안을 계약 $\cdot$ 제도적 측면, 운영 $\cdot$ 관리적 측면, 그리고 외부시스템과의 연계 측면에서 제시한다

Keywords