Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model

강교량 제작 프로세스 모델을 기반으로한 WBS구축

  • 하승호 (중앙대학교 토목공학과) ;
  • 김석 (중앙대학교 토목공학과) ;
  • 김경민 (중앙대학교 토목공학과) ;
  • 박찬혁 (중앙대학교 토목공학과) ;
  • 김경주 (중앙대학교 건설환경공학과)
  • Published : 2004.11.01

Abstract

The objective of this study is to implement a WBS (Work Breakdown Structure) so as to support efficient information management through the construction process of Steel Box Girder Bridge. To meet this requirement. This study performs the analysis of the business process. Through the work, information flows and information management levels are identified. Information management in each manufacturing process was various in its level. For the efficient information management, skating and utilization in schedule, cost, resource, and quality management, it is recommended to utilize a WBS composed of major work section and element structure of the steel box girder.

본 연구의 목적은 강교량 제작 현장에서의 효율적인 정보관리를 지원하기 위한 정보관리체계의 구축을 목적으로 한다. 이를 위해 강교량 제작 업무 프로세스와 제작공종별 발생정보의 흐름과 정보관리 레벨(Level)을 분석함으로써 업무 수행과정에서의 효율적인 정보관리를 지원하기 위한 WBS 구축방안에 대한 연구를 수행하였다. 강교량 제작은 다양한 제작공정을 거쳐 수행되며, 각 단계별 업무 목적 및 관행에 따라 다양한 정보관리 수준을 갖는 것으로 파악되었으며, 효율적인 공정, 원가, 자원 및 풀질 등의 정보 관리, 공유 및 재활용을 위해서는 공종과 강교 거더의 부위 분류체계를 바탕으로 한 WBS의 구축이 바람직한 것으로 분석되었다.

Keywords