Application of Supply Chain Management Concept to the Various Types of Curtain Wall Construction

커튼월의 공법 및 조달 유형에 따른 SCM 적용방안

  • 문우경 (성균관대학교 대학원) ;
  • 윤수원 (성균관대학교 대학원) ;
  • 김예상 (성균관대학교 건축 조경 및 토목공학부) ;
  • 진상윤 (성균관대학교 건축 조경 및 토목공학부) ;
  • 박지훈 (대림산업 기술연구소)
  • Published : 2004.11.01

Abstract

Today, the curtain wall is used in many construction projects because of excellent economical efficiency and constructability. The life-cycle process of curtain wall construction consists of the architectural design, curtain wall design, manufacturing, const겨ction, and maintenance phase which has become one of the most important objects that have to be managed. Since the general management method focused on each separated phase, it has accompanied many problems such as increases of the cost and duration, and loss of productivity. To solve these problems, it is necessa교 to have a new management method based on supply chain management. Thus this research analysed the processes of stick system, semi-unit system, unit system, and panel system classified by the type of the curtain wall, and suggested proper methods of application of SCM concept to each type of curtain wall construction.

오늘날 뛰어난 시공성과 경제성으로 인해 수많은 건설 프로젝트에서 커튼월이 사용되고 있으며 특히 국내 초고층 프로젝트의 커튼월 공사는 전체 Life-cycle 상의 건축설계, 커튼월 선계, 제작, 조달, 시공, 유지관리의 모든 단계에서 다양한 주체들이 관여하는 공종으로 주요 관리 대상이 되었다. 기존의 관리방식은 Life-cycle의 각 단계별 관리에 초점을 맞춤으로써 비용 및 공기 증가, 생산성 저하, 풀질 퍼하 등의 문제가 빈번히 발생하고 있는 실정으로 이를 해결하기 위하여 공급사슬관리(Supply Chain Management)를 적용한 통합관리가 필요하다. 이에 본 연구는 커튼월 공사 전체 Life-cycle 관리에 대해 SCM 개넘을 적용하기 위해 커튼월의 방법 및 조달유형에 따라 분류되어진 Sick system, Semi-unit system, Unit-system, Panel system 커튼월의 프로세스를 분석하고 SCM 관전에서 각 프로세스의 조직, 정보, 생산 관점에서 차이점을 규명하고 각각에 대한 SCM의 적용방안을 제시하였다.

Keywords