Arc-furnace facilities consume 9,895,165(MWh) which is about 69.6 Percent of electronic furnace power consumption. and interior of a country demand power have inclosed annual. but becaused of the problem of cost, power plant location, and environment have faced difficulty to electric power supply. In this paper, Examining Load cutting of Arc-furnace that is dominating high weight of industry electric power use. and it is expected to solve easily electric power supply and demand problem by highest Priority load cutting examination of Arc-furnace when electric power supply and demand problem happens to area electric power system when is urgent.