500 kV 수평배열 1회선 송전선로의 재폐로 무전압시간 산정

Calculation of Reclosing Dead Time of 500 kV Horizontal Single Circuit Transmission Line

  • Shim, E.B. (Korea Electric Power Research Institute) ;
  • Kwak, J.S. (Korea Electric Power Research Institute) ;
  • Joo, H.J. (Korea Electric Power Research Institute) ;
  • Park, H.S. (Korea Electric Power Research Institute) ;
  • Kang, Y.W. (Korea Electric Power Research Institute)
  • 발행 : 2005.07.18

초록

It is usual to operate the long transmission line with transposition of each phase in order to avoid voltage unbalance due to unbalanced capacitances at each phase of the line end. This paper described the Ferranti voltage rise of line end, charging current and secondary arc current according to the transposition of line or not. The positive and negative sequence current was derived by the phase current, and then the unbalanced rate was calculated. Then, we obtained the reclosing dead time of the single phase reclosing scheme for 500 kV single circuit horizontal arrangement transmission line system.