A Study on a Criterion of Transmission Planning in a Competitive Electricity Market

경쟁적 전력시장에서 혼잡을 고려한 송전설비계획 기준설정에 관한 연구

  • Published : 2005.07.18

Abstract

In a competitive environment of electric power industry, developing the technological criterions and methodologies on transmission planning is becoming new challenge to transmission system planner. The use of a locational signal and the provision of a indicative plan to control the transmission investment reasonably is very important in the viewpoint of a regulator. The main target of this study is to develop a systematic criterion of transmission expansion planning. And system congestion cost is considered. The proposed methodology was demonstrated with several case studies.

Keywords