한국콘크리트학회:학술대회논문집 (Proceedings of the Korea Concrete Institute Conference)
- 한국콘크리트학회 2005년도 봄학술 발표회 논문집(II)
- /
- Pages.265-268
- /
- 2005
해상 전력구조물 내구성 실증 실험장 구축 및 운영
Development and Operation of Durability Mock-Up Test Facilities for Offshore Electricity Structures
초록
This paper discusses a strategy and status for development and operation of durability mock-up test facilities for offshore structures. The strategy is examplified and facilitated using an offshore transmission tower crossing the West sea and the Shihwha lake, which was designed and constructed 345kV T/L lines transmitting power from Yeong-Heung fossil power plant to Seoul metropolitan area. Various data for corrosion protection, aging, life-prediction of concrete and steel offshore structures can be obtained using the proposed mock-up test facility. Acquired data will be used for further research on durability, life-prediction, and retrofit of structures. It is important to maintain the safety of 345 kV Yeong-Heung transmission line crossing the Shihwha lake because the offshore structure is one of the critical electric facilities transmitting large power to the metropolitan area. Operation of the offshore transmission tower mock-up is expected to make a significant contribution to stable power supply.
키워드