한국철도학회:학술대회논문집 (Proceedings of the KSR Conference)
- 한국철도학회 2005년도 추계학술대회 논문집
- /
- Pages.482-487
- /
- 2005
위험도평가에 기초한 예방유지관리 계획 - 부산지하철 반송선의 설계 예 -
Development of Preventive Maintenance Plan based on PRA - Case Study of Pansong-Line Railway in Pusan -
초록
In the most current Turn-key bidding and Alternative design, is going to establish maintenance plan along with a economical assessment (VE/LCC assessment etc). Generally, establishment of maintenance plan is based on past experiences that are decided upon sensor position and amount with analytic or mechanical control section. But, it is more reasonable that maintenance plan based on level of significance for Probabilistic Risk, with presuming damage probability assessment of structural fracture scenarios. Therefore, in this study it is considered about the technique that an improved maintenance plan of railroad structures using PRA (Probabilistic Risk Assessment) on the basis of structural reliability theory. For this, in the paper, Preventive maintenance plan based on PRA is suggested with an application example of Pansong-Line (Line number 3) railway in Pusan works that actually executed Turn-key design.
키워드