Abstract

The operation speed improvement of the train in electric railway must pursue continuously and need the investigation of whole railway system whole. The high-speed of the train is related to not only vehicle technique but also the infrastructure, signal system, operation technique, the trolley line and catenary, economical efficiency. Specially, in case of electric railway, we have to consider a technical investigation which is current collection efficiency improvement, voltage drop countermeasure, equipment capacity, track force, signal system. In this paper, we presents the technical investigation of AT feeder system in order to achieve high speed train in exist real railroad. We proved this approach which will use the whole domestic lines in the future.

전기철도에 있어서 열차의 운행속도향상은 지속적으로 추구해야할 당면한 과제이며, 이를 위해서는 철도시스템 전반에 걸친 검토가 이루어져야 한다. 열차의 고속화는 차량기술 뿐만 아니라, 선로 구축물, 신호시스템, 운영기술, 전차선로, 급전시스템 등이 상호 연계되어 종합적으로 경제성을 고려하여 추진되어야 한다. 특히, 전기철도 급전계통의 경우만 보더라도 고속열차가 기존운영선로에 투입될 경우 차량의 집전성능향상, 전압강하대책, 설비용량대책, 궤도노반, 분기기, 신호의 고속화, 전차선로 구조물 검토 등 여러 가지 기술검토가 반드시 수반되어야 한다. 본 논문에서는 이 가운데 AT급전계통에서의 신규의 고속화 열차 투입에 따른 급전계통의 기술검토에 대한 접근방안을 제시하고 실 계통을 대상으로 부하용량 변화의 정도를 예측함으로써, 향후 국내 노선의 전반에 걸쳐 적용 가능함을 입증할 수 있었다.

Keywords