터널공사 사례분석에 의한 설계변경 표준프로세스 구성방안

Case Study and Standard Process Analysis of Change Order in Design for Road Tunnel Project

  • 강인석 (경상대학교 토목공학과) ;
  • 김동광 (경상대학교 토목공학과, 한국도로공사) ;
  • 정원명 (경상대학교 토목공학과, (주)용마엔지니어링) ;
  • 이승렬 (경상대학교 토목공학과, 한국철도공사) ;
  • 김현수 (경상대학교 토목공학과)
  • 발행 : 2005.11.01

초록

Recently, tunnel structure is being widely used in railway or roadway construction projects because earthwork causes large cutting and damages in environmental factors. However, there are many changes of design by different items comparing with design phase in tunnel structure by uncertain drawings. This study develops a standard process for the change of design to reduce change orders in construction phase.

키워드