A Study of Parallel Reservoir Integrated Operation considering Storage

저류량을 고려한 병렬저수지 연계운영

  • 박기범 (안동과학대학 건설정보과) ;
  • 이순탁 (영남대학교 건설환경공학부)
  • Published : 2006.05.18

Abstract

The purpose of this study was to estimate water supply analysis and reliability indicators by using allocation rule(AR) about Andong Dam and Imha Dam which have parallel reservoirs system. According to the analysis results of allocation rule, for Rule(A) and Rule(B), the contribution of water supply in Andong Dam was 60% more than in Imha Dam, and for Rule(C), the contributions in Andong Dam and Imha Dam were almost equal. In Rule(C), supply is allocated by the ratio which divides the sum of storage and inflow by the mean storage according to the storage state and supply capability state of Andong Dam and Imha Dam. This Rule(C) showed good results in the water supply capability analysis and reliability analysis of parallel reservoirs. In the analysis criteria of water supply in parallel reservoirs system, monthly water change quantity showed better results than monthly constant water quantity in water supply analysis. On the basis of this study, the new technique for water supply analysis was developed to be applied to parallel reservoirs, and this operation rule will establish the efficient operation measures in the application to several kinds of parallel reservoirs system.

본 연구에서는 병렬구조를 가진 안동댐과 임하댐에 대하여 할당법칙(Allocation rule, AR)을 이용하여 용수공급해석과 신뢰도지표를 산정하였다. 할당계수의 분석결과로는 안동댐이 용수공급의 기여도가 임하댐과 비교해서 Rule(A), Rule(B)에서는 66%이상으로 분석되었으며, Rule(C)의 경우 거의 대등한 기여를 하는 것으로 분석되었다. Rule(C)의 경우는 안동댐과 임하댐의 각각의 저류상태와 공급능력 상태에 따라 저류량과 유입량의 합을 댐의 평균저류량으로 나눈 비에 의해 공급량이 할당되어서 우수한 결과를 나타내었다. 병렬저수지 시스템의 용수공급의 분석기준에 있어 월별로 일정한 양을 기준으로 분석하는 것보다는 월별 용수변화량을 고려한 경우가 용수공급분석에 있어 우수한 결과를 나타나는 것으로 분석되었다. 본 연구를 기초로 하여 용수공급해석을 위한 새로운 기법이 개발되어 병렬저수지에 적용되었으며, 이 운영규칙은 여러 종류의 병렬저수지 시스템의 적용에 있어 효율적인 운영방안을 수립할 수 있을 것이다.

Keywords